英文合同

时间:2024-07-08 09:28:46 合同 我要投稿

英文合同集合七篇

  随着法律观念的深入人心,人们运用到合同的场合不断增多,合同是对双方的保障又是一种约束。那么合同书的格式,你掌握了吗?以下是小编整理的英文合同7篇,希望对大家有所帮助。

英文合同集合七篇

英文合同 篇1

  买方 The Buyer:

  地址 Address

  Tel: Fax:

  卖方 The Seller:

  地址: Address

  Tel: Fax:

  本合同由买卖双方订立,根据本合同规定的条款,买方同意购买,卖方同意出售下述商品:

  This Contract is made by and between the Buyers and Sellers, whereby the Buyers agree to buy and the Sellers agree to sell the under-mentioned commodity according to the terms and conditions stipulated below:

  (1) 货名及规格 Commodity & Specification

  (2) 数量 Qty.

  (3) 单价 Unit Price

  (4) 总价Total Amount

  (5) 原产公司:COUNTRY OF ORIGIN :

  (6) 装运期限:TIME OF SHIPMENT:

  (7) 装运口岸:PORT OF SHIPMENT:

  (8) 到货目的地:DESTINATION:

  (9) 保险: INSURANCE:

  由卖方按合同金额11%投保一切险和战争险

  All Risks and War Risk for 11% contract value to be covered by the Seller.

  (1) 运输方式:TERM OF SHIPMENT: 空运 By air

  (11) 包装:PACKING:

  须用坚固的新木箱包装,适合长途空运/陆运,防湿、防潮、防震、防锈、耐粗暴搬运。由于包装不良所发生的损失,由于采用不充分或不妥善的防护措施而造成的任何锈损、破损,卖方应负担由此而产生的一切费用和损失。包装箱内应包含一整套服务操作手册。卖方使用的木质包装应经薰蒸处理,并在木质包装表面标上清晰的IPPC标识。

  To be packed in new strong wooden case(s) suitable for long distance air/land transportation and well protected from dampness, moisture, shock, rust and rough handling. The Sellers shall be liable for any damage to the goods on account of improper packing and for any rust damage and break damage attributable to inadequate or improper protective measures taken by the Sellers, and in such case or cases any and all losses and / or expenses incurred in consequence thereof shall be borne by the Sellers. One full set of service and operation manuals concerned shall be enclosed in the case(s). The wood packaging the Seller used shall be fumigated and marked with “IPPC” on the surface of wood packaging.

  (12) 唛头:SHIPPING MARK:

  卖方应在每件包装上,用不褪色油墨清楚地标刷件号、尺码、毛重、净重、“此端向上”、“小心轻放”、“切勿受潮”等字样,并刷有下列唛头:

  On the surface of each package, the package number, measurements, gross weight, net weight, the lifting positions, such cautions as “THIS SIDE UP”, “HANDLE WITH CARE”,“KEEP AWAY FROM MOISTURE” and the following shipping mark:

  (13) 付款条件:TERMS OF PAYMENT:

  1%的合同金额通过电汇支付。1% contract value by T/T.

  买方在合同生效后两周内支付合同金额的1%货款

  The Buyer shall pay 1% advance payment to the Seller within two week after contract effected.

  (14) 单据:Documents,

  1. 正本空运单(收货人联),标明“运费已付”及唛头,买方为收货人及通知方。

  Original Airway Bill (copy for Consignee) marked “freight prepaid” and shipping mark, consign to and notify the Buyer.

  2. 涵盖1%合同金额的商业发票三正三副,注明合同号、唛头。

  Commercial invoice covering 1% of contract amount in 3 originals and 3 copies, indicating contract number, shipping mark.

  3. 装箱单三正三副,注明毛、净重、尺码和所装货物的'包装形式及数量。

  Detailed Packing List in 3 originals and 3 copies indicating both gross and net weights, measurements and packing condition and quantity of each item packed.

  4. 卖方出具的质量及数量证书正本三份。

  Certificate of quality and quantity issued by seller in 3 originals.

  5. 卖方出具的原产地证书一正一副。

  Certificate of origin in 1 original and 1 copy issued by Seller.

  6. 货物装运后24小时内卖方发给买方装运通知传真复印件一份。

  Copy of fax from seller to the buyer advising the particulars of shipment within 24 hours after shipment is made.

  7. 保险单或保险证明一正一副,按照合同金额11%投保一切险及战争险。

  Insurance Policy or Certificate for 11% contract value, covering All Risks and War Risk in 1 original and 1 copy.

  8. 卖方声明外包装表面标有IPPC标识证书正本一份, 或卖方出具的非木质包装证明正本

  Seller’s Certificate in 1 original certifying IPPC has been marked on surface of the wooden cases / seller’s Certificate certifying no wood package is used in the shipment.

  (15) 装运通知:SHIPPING ADVICE:

  The Sellers shall fax to the Buyer the Readiness Notification one week before the goods to be shipped.

  卖方在发货前一周物向买方传真货物备妥通知。

  The Sellers shall, immediately upon the completion of the loading of the goods in 24 hours, send the Buyers Air Waybill, Invoice and Packing list by fax.

  装运通知:卖方应在货物装运完毕后24小时内用传真将空运单、发票和装箱单发给买方。

英文合同 篇2

  合同号:_________

  no:_________

  日期:_________

  date:_________

  为在平等互利的基础上发展贸易,有关方按下列条件签订本协议:

  this agreement is entered into between the parties concerned on the basis of equality and mutual benefit to develop bussiness on terms and conditions mutually agreed upon as follows:

  1.订约人

  contracting parties

  供货人(以下称甲方):_________

  supplier(hereinafter called “party a”):_________

  销售代理人(以下称乙方):_________

  agent(hereinafter called “party b”):_________

  甲方委托乙方为销售代理人,推销下列商品。

  party a hereby appoint party b to act as his selling agent to sell the commodity mentioned below.

  2.商品名称及数量或金额

  commodity and quantity or amount

  双方约定,乙方在协议有效期内, 销售不少于_________的商品。

  it is mutually agreed that party b shall undertake to sell not less than _________ of the aforesaid commodity in the duration of this agreement。

  3.经销地区

  territory

  只限在_________。

  in _________ only.

  4.订单的确认

  confirmation of orders

  本协议所规定商品的数量、价格及装运条件等,应在每笔交易中确认,其细目应在双方签订的销售协议书中作出规定。

  the quantities, prices and shipments of the commodities stated in this agreement shall be confirmed in each transaction, the particulars of which are to be specified in the sales confirmation signed by the two parties hereto.

  5.付款

  payment

  订单确认之后,乙方须按照有关确认书所规定的时间开立以甲方为受益人的保兑的'、不可撤销的即期信用证。乙方开出信用证后,应立即通知甲方,以便甲方准备交货。

  after confirmation of the order, party b shall arrange to open a confirmed, irrevocable l/c available by draft at sight in favour of party a within the time stipulated in the relevant s/c. party b shall also notify party a immediately after l/c is opened so that party a can get prepared for delivery.

  6.佣金

  commission

  在本协议期满时,若乙方完成了第二款所规定的数额,甲方应按装运货物所收到的发票累计总金额付给乙方_________%的佣金。

  upon the expiration of the agreement and party b's fullfilment of the total turnover mentioned in article 2, party a shall pay to party b _________% commission on the basis of the aggregate amount of the invoice value against the shipments effected.

  7.市场情况报告

  reports on market conditions

  乙方每3个月向甲方提供一次有关当时市场情况和用户意见的详细报告。同时,乙方应随时向甲方提供其他供应商的类似商品样品及其价格、销售情况和广告资料。

  party b shall forward once every three months to party a detailed reports on current market conditions and of consumers' comments. meanwhile, party b shall,from time to time, send to party a samples of similar commodities offered by other suppliers, together with their prices, sales information and advertising materials.

  8.宣传广告费用

  advertising & publicity expenses

  在本协议有效期内,乙方在上述经销地区所作广告宣传的一切费用,由乙方自理。乙方须事先向甲方提供宣传广告的图案及文字说明,由甲方审阅同意。

  party b shall bear all expenses for advertising and publicity within the aforementioned territory in the duration of this agreement and submit to party a all patterns and/or drawings and description for prior approval.

  9.协议有效期

  validity of agreement

  本协议经双方签字后生效,有效期为_________天,自_________至_________。若一方希望延长本协议,则须在本协议期满前1个月书面通知另一方,经双方协商决定。

  若协议一方未履行协议条款,另一方有权终止协议。

  this agreement, after its being signed by the parties concerned, shall remain in force for _________ days from _________ to _________ if either party wishes to extend this agreement, he shall notice, in writing, the other party one month prior to its expiration. the matter shall be decided by the agreement and by consent of the parties hereto. should either party fail to implement the terms and conditions herein, the other party is entitled to terminate this agreement.

  10.仲裁

  arbitration

  在履行协议过程中,如产生争议,双方应友好协商解决。若通过友好协商达不成协议,则提交中国国际贸易促进委员会对外贸易仲裁委员会,根据该会仲裁程序暂行规定进行仲裁。该委员会的决定是终局的,对双方均具有约束力。仲裁费用,除另有规定外,由败诉一方负担。

  all disputes arising from the execution of this agreement shall be settled through friendly consultations. in case no settlement can be reached, the case in dispute shall then be submitted to the foreign trade arbitration commission of the china council for the promotion of international trade for arbitration in accordance with its provisional rules of procedure. the decision made by this commission shall be regarded as final and binding upon both parties. arbitration fees shall be borne by the losing party ,unless otherwise awarded.

  11.其他条款

  other terms & conditions

  (1)甲方不得向经销地区其他买主供应本协议所规定的商品。如有询价,当转达给乙方洽办。若有买主希望从甲方直接订购,甲方可以供货,但甲方须将有关销售确认书副本寄给乙方,并按所达成交易的发票金额给予乙方_________%的佣金。

  party a shall not supply the contracted commodity to any other buyer(s) in the above mentioned territory. direct enquiries, if any, will be referred to party b. however, should any other buyers wish to deal with party a directly, party a may do so. but party a shall send to party b a copy of sales confirmation and give party b _________% commission on the basis of the net invoice value of the transaction(s)concluded.

  (2)若乙方在_________月内未能向甲方提供至少_________订货,甲方不承担本协议的义务。

  should party b fail to pass on his orders to party a in a period of _________ months for a minimum of _________, party a shall not bind himself to this agreement.

  (3)对双方政府间的贸易,甲方有权按其政府的授权进行有关的直接贸易,而不受本协议约束。乙方不得干涉此种直接贸易,也无权向甲方提出任何补偿或佣金要求。

  for any business transacted between governments of both parties, party a may handle such direct dealings as authorized by party a's government without binding himself to this agreement. party b shall not interfere in such direct dealings nor shall party b bring forward any demand for compensation therefrom.

  (4)本协议受签约双方所签订的销售确认条款的制约。

  this agreement shall be subject to the terms and conditions in the sales confirmation signed by both parties hereto.

  12.本协议于_________年_________月_________日在_________签订,正本两份,甲乙双方各执一份。

  this agreement is signed on _________ at _________ and is in two originals;each party holds one.

  甲方(签字):_________ 乙方(签字):_________

  party a(signature):_________ party b(signature):_________

英文合同 篇3

  Contract(“Contract”)is dated as of_________by and between____________,_____________(“Assignor”)and Development Company,with its principal place of business at_________(“Devoc”).

  本合同(以下简称“合同”由______________(名称),______________(地址)(以下简称“转让人”)和主要营业地位于__________的迪威开发公司(以下简称“迪威公司”)于____________(日期)共同签订。

  s0 T" O, x! u' K WHEREAS,Devco is a developer of interactive art,literature,and entertainment products;" m" r' N# d#

  鉴于:迪威公司是一家从事互动艺术、文学和娱乐产品的开发公司;, U, t/ u, B0 y2 g A% k WHEREAS,Assignor has contributed certain material to Devco for the multimedia product(Work),and the parties intended that Devco be the owner of all rights in Work.The contract will confirm such understanding.

  鉴于:转让人已经将某些物质提供给迪威公司以生产多媒体产品(以下简称“作品”),且双方当事人已就迪威公司作为作品一切权利的所有人一事产生意向。本合同将确认此共识。

  NOW THEREFORE,the parties agree as follows:, h 故双方当事人现就以下事项达成协议:!

  1.Assignor hereby irrevocably assigns,conveys and otherwise transfers to Devco,and its respective successors,licensees,and assignees,all right,title and interest worldwide in and to the Work and all proprietary rights therein,including,without limitation,all copyrights,trademarks,design patents,trade secret rights,moral rights,and all contract and licensing rights,and all claims and causes of action in respect to any of the foregoing,whether now known or hereafter to become known.In the event Assignor has any right in the Work which cannot be assigned,Assignor agrees to waive enforcement worldwide of such right against Devco,its distributors,and customers or,if necessary,exclusively license such right worldwide to Devco,with the right to sublicense.These rights are assignable by Devco.

  转让人在此将作品具有的和相关的一切属世界范围性质的权利、所有权和利益以及作品具有的一切专属权不可撤销地完全转让给迪威公司、其各继承人、被特许人、受让人,其包括,但不限于,所有版权、商标、外观设计专利、商业秘密、作者精神权利、一切承包和特许权利、以及与上述相关的一切诉权和诉因,不论其是现在已经为人所知或是在缔约之后才为人所知。如果转让人拥有的某作品权利无法转让,转让人同意

  放弃在世界范围内执行此权利以对抗迪威公司、其发行人、以及客户的权利,或,如有必要,将此种属世界范围性质的权利特许给迪威公司,包括转特许权在内。这些权利均可被迪威公司转让。

  2.Assignor represents and warrants that a)the Work was created solely by Assignor,Assignor's full-time employees during the course of their employment,or independent contractors who assigned all right,title and interest in their work to Assignor;(b)Assignor is the owner of all right,title and interest in the tangible forms of the Work and all intellectual property rights protecting them;(c)the Work and the intellectual property rights protecting them are free and clear of all encumbrances,including,without limitation,security interests,licenses,liens,Charges or other restrictions;(d)the use,reproduction,distribution,or modification of the Work does not and will not violate the rights of any third parties in the Work including,but not limited to,trade secrets,publicity,privacy,copyrights,and patents;(e)the Work is not in the public domain;and(f)Assignor has full power and authority to make and enter into this Contract.Assignor agrees to defend,indemnify,and hold harmless Devco,its officers,directors and employees for any claims,suits or proceedings alleging a breach of these warranties.

  二、转让人陈述并担保:1)作品是由转让人独立创作,或由转让人的正式雇员在其雇佣期间所创作,或由独立承包人所创作,但该承包人已经将其作品的一切权利、所有权和利益转让给了转让人;2)转让人是作品所有形式一切权利、所有权和利益以及保护这些权利的一切知识产权的所有人;3)作品及保护作品的知识产权不受任何限制和无任何瑕疵,包括,但不限于,物权担保、特许权、留置权、抵押权或其他限制;4)作品的使用、复制、发行、或变更现在不会将来也不会侵犯作品任何第三方当事人的'权利,包括,但不限于,商业秘密、广告宣传权、隐私权、版权、以及专利权;5)作品不属公共领域范畴之内;以及6)转让人完全有权力和权限签订本合同。转让人同意保护迪威公司、其高级职员、承包人和雇员,确保其不会因违反上述担保为由而提起的任何索赔、诉讼或程序遭受损失和伤害。

  3.Assignor agrees that he or she will take all actions and execute any and all documents as may be requested by Devco,at Devco's expense,from time to time to fully vest in Devco all rights,title and interests worldwide in and to the Work.% w+ n" i" P2 H n% V; g9 E

  三、转让人同意他或她将采取一切行为签署迪威公司可能要求签署的任何或所有文件,随时将作品所具有的以及相关的属世界范围性质的一切权利、所有权和利益完全授予迪威公司。

  Y, N* {# [) q. T# m" G! |# L 4.In consideration of the foregoing,Devco agrees to pay to Assignor the sum of Dollars($)__________.

  四、有鉴于此,迪威公司同意支付转让人一笔数额为________元的款项。

英文合同 篇4

  建筑合同 ARCHITECTURE CONFIRMATION

  甲方:Party A: 乙方:Party B:

  合同编号: Contract No

  日期:Date:

  签约地点:Signed at:

  特约定:

  甲方基于下文所列各种因素,特与乙方达成了协议并一致同意:由甲方在订约日期之翌日起_____天之内为乙方建造并完成_____(涉约建筑)。涉约建筑之规模及所需的钢筋、水泥、砖块、石子和其它建筑材料之数量,均在作为合同附件的`设计图和施工细则中予以说明。

  Witnesses that the Party A for considerations hereinafter named, contracts and agrees with the Party B that Party A will, within_____ days, next following the date hereof, build and finish a Libarary Building for Party B. ( the building hereinafter is referred to as the said building.) The said building is of the following dimensions, with reinforced concrete, brick, stones and other materials, as are described in plans and specifications gereto annexed.

  基于上述情况,乙方及其法定代表郑重承诺向甲方支付人民币_____元整。支付方法商定如下:

  In consideration of the foregoing, Party B shall, for itself and its legal representatives, promise to pay Party A the sum of one million RMB yuan in manner as follows, to wit:

  在上述工程开工之日,支付人民币_____元整

  在_____年_____月_____日,支付人民币_____元整

  在_____年_____月_____日,支付人民币_____元整

  在_____年_____月_____日,支付人民币_____元整

  在_____年_____月_____日,支付人民币_____元整

  余额人民币_____元整于工程完成之日付清。

  RMB_____at the beginning of the said work.

  RMB_____on _____/ _____/_____( for example: 3/21/20xx)

  RMB_____ on_____/ _____/_____

  RMB_____ on_____/ _____/_____

  RMB_____ on_____/ _____/_____

  And the remaining sum will be paid upon the completion of the work.

  订约双方并同意由甲方或其法定代表在领取各项付款时,为证明有权领用上述各次付款(第一次付款除外,因其另有保证),必须由建筑师作出评定,证明已经收到的付款之价值已经消耗在劳务及材料费用之中。

  It is further agreed that in order to be entitled to the said payments ( the first one excepted, which is otherwise secured ), Party A or its legal representatives shall, according to the architect's appraisement, have expended, in labor and material, the value of the payments already received by Party A, on the building, at the time of payment.

  上述协议如未能忠实执行,则违约一方同意其应享有权利自动丧失,且在违约之日后一个月之内,向对方或其法定代表赔偿人民币_____元整,作为商定之损失赔偿费。

  For failure to accomplish the faithful performance of the agreement aforesaid, the party so failing agrees to forfeit and pay to the other_____RMB yuan as fixed and settled damages, within one month form the time so failing.

  为示信守,各方谨于上文起首载明之日期签名、盖章。

  本合同当下列人员之面交付。

  In witness whereof we have hereunto set our hands and seals the day and year first above written.

  Signed, sealed and delivered

  in the presence of

  甲方:Party A : 乙方:Party B:

英文合同 篇5

  SALES CONTRACT

  NO.:BS08125 DATE: NOV.6,20xx

  THE SELLER: BLUE SKY INTERNATIONAL TRADING CO.,LTD.

  118# 5TH NORTH RING ROAD, BEIGING, P.R.CHINA

  THE BUYER:STAR CORPORATION

  5 KINGROAD DUBAI, UAE

  This Contract is made by and between the Buyer and Seller, whereby the Buyer agree to buy and the Seller agree to sell the under-mentioned commodity according to the terms and conditions stipulated below:

  数量和金额可以上下浮动5%

  PACKING:20 pieces of Baby Blankets are packed in one export standard carton, solid color and size in the same carton. 包装:20条童毯被装进一项输出品标准硬纸盒、一样颜色和尺寸的装在相同的硬纸盒。

  MARKS: Shipping mark includes STAR ,S/C No. ,style No. , port of destination and carton No. 唛头:运输唛头包括STAR(公司名)、合同(sales contract)号码,款式号码,目的港和纸箱号码

  Side mark must show the color, the size of carton and pieces per carton.

  侧唛头必须显示纸箱颜色,规格和每箱(童毯)条数

  TIME OF SHIPMENT:装运期

  Within 60 days upon receipt of the L/C which accord with relevant clauses of this Contract.收到符合合同的信用证,六十天内

  PORT OF LOADING AND DESTINATION: From Tianjin, China to Dubai, UAE

  装运港 目的港

  Transshipment is allowed and partial shipment is prohibited.

  转运被允许,而且分批装运被禁止。

  INSURANCE: To be effected by the Seller for 110% of invoice value covering All Risks and War Risks as per CIC of PICC dated 01/01/1981.保险:卖方按合同金额的'110% 投保 包含的一切险和战争险依照1981年的 PICC 规则的 CIC 条约。

  TERMS OF PAYMENT: By irrevocable Letter of Credit at 60 days after sight, reaching the Seller not later than Nov.30, 20xx and remaining valid for negotiation in China for further 15 days after the affected shipment. In case of late arrival of the L/C, the Seller shall not be liable for any delay in shipment and shall have the right to rescind the contract and /or claim for damages.付款期限:不可撤销信用证,见票后60天付款.卖方收到信用证不得晚于08年11月30号。偿付通知议付在中国 装船后15天内提交单据,如果信用证迟到,卖方将不负责装船中的任何延迟而且将有权利废止合同和│或损害要求(赔偿)。

  DOCUMENTS:文件

  +Signed invoice in triplicate, one original of which should be certified by Chamber of Commerce or CCPIT and legalized by UAE embassy/consulate in seller’s country.

  +签署的单据一式三份,一份正本应该被商会或 CCPIT (贸促会)检定而且在卖方的国家被阿拉伯联合大公国大使馆│领事法律上认为正当。

  +Full set (3/3) of clean on board ocean bill of lading marked “freight prepaid” made out to order blank endorsed notifying the applicant.

  +全套 (3|3) 清洁海运提单 标记" 船货预付 " 空白抬头提单通知申请人。 +Insurance policy in duplicate endorsed in blank.

  +保险单一式两份空白背书。

  +Packing list in triplicate.

  +包装目录一式三份

  +Certificate of origin certified by Chamber of Commerce or CCPIT and legal

  ized by UAE embassy/consulate in seller’s country.

  +被商会或 CCPIT(贸促会) 检定的原产地证明书而且在卖方的国家根据阿拉伯联合大公国大使馆│领事法律上认为正当。

  INSPECTION: The certificate of quality issued by the China Entry-Exit Inspection and Quarantine Bureau shall be taken as the basis of delivery.

  检验:质量证书根据中国进出口检验检疫局发行,将当做交付的基础。

  CLAIMS: In case discrepancy on the quality or quantity of the goods is found by the Buyer, after arrival of the goods at the port of destination, the Buyer may, within 30 days and 15 days respectively after arrival of the goods at the port of destination, lodge with the Seller a claim which should be supported by an Inspection Certificate issued by a public surveyor approved by the Seller. The Seller shall, on the merits of the claim, either make good the loss sustained by the Buyer or reject their claim, it being agreed that the seller shall not be held responsible for any loss or losses due to natural cause failing within the responsibility of Ship owners of the Underwriters. The Seller shall reply to the Buyer within 30 days after receipt of the claim.

  索赔:买方发现货物在质量和数量上有差异,货物到达目的港后,买主可以,在30 天到15 天之内,在货物抵达后在目地港,向卖方提出要求,要求应该被一份被卖方核准的公众的检查官发行的检验证书支援。卖方,在在赔偿要求中,要么承受买方损失 要么拒绝索赔,经双方同意,卖方将不承担任何损失 或者 损失是由自然原因将或由船方造成的损失 卖方应在30天内答复买方。

  LATE DELIVERY AND PENALTY: In case of late deliver, the Buyer shall have the right to cancel this contact, reject the goods and lodge a claim against the Seller. Except for Force Majeure, if late delivery occurs, the Seller must pay a penalty, and the Buyer shall have the right to lodge a claim against the Seller. The rate of penalty is charged at 0.5% for every 7 days, odd days less than 7 days should be counted by the paying bank or the Buyer from the payment.

  迟期交货及刑罚:以防迟到的传递,需方有权取消这个合同,拒绝接受货物和向卖方提出索赔。除不可抗力,如果迟期交货时,卖方必须支付违约金,买方有权向卖方提出索赔。罚金是0.5%,每7天,天数不到7天应安7天算 由银行付款银行或由买方的货款中扣除。

  FORCE MAJEURE: The Seller shall not held responsible if they, owing to Force Majeure cause or causes, fail to make delivery within the time stipulated in the Contract or cannot deliver he goods. However, in such a case, the Seller shall inform the Buyer immediately by cable and if it is requested by the Buyer, the Seller shall also deliver to the Buyer by registered letter, a certificate attesting the existence of such a cause or causes.

  不可抗力:卖方不负责,但卖方必须立即以传真或原因,不可抗力原因,未能交货时间内应收的合同或不能救他的货物。然而,在这种情况下,卖方应立即以电报通知买方。如果是按照买主的要求,卖方应负责向买方把挂号信,证书,证明这样的原因还是存在的原因。

  ARBITRATION: All disputes in connection with this contract or the execution thereof shall be settled amicably by negotiation. In case no settlement can be reached, the case shall then be submitted to the China International Economic Trade Arbitration Commission for settlement by arbitration in arbitration in accordance with the Commission’s arbitration rules. The award rendered by me commission shall be final and binding on both parties. The fees for arbitration shall be borne by the losing

  party unless otherwise awarded.

  仲裁:凡有关本合同或实施应通过友好协商予以解决。若通过友好协商未能达成协议,则应提交中国国际经济贸易仲裁委员会仲裁在解决根据该会的仲裁规则进行仲裁。我的裁决是中局的,对双方都有约束力。仲裁费用应由败诉方承担除非另有判决。

  This contract is made in four original copies and becomes valid after signature, two copies to be held by each party.

  本合同正本及成为四个有效签名后,双方各两份。

  Signed by:

  THE SELLER:

  BLUE SKY INTERNATIONAL TRADING CO, .LTD.

  Tian Fang THE BUYER: STAR CORPORATOON Lamia Khashoggi

英文合同 篇6

  office lease agreement (agent)

  出租方(甲方):

  公司地址: 邮编:承租方(乙方):

  公司地址:

  lessee (party b):

  address:

  post code:根据《中华人民共和国合同法》及有关规定,为明确出租方与承租方的权利义务关系,经双方协商一致,签订本合同。

  in accordance with “contract law of prc.” and other related regulations, in order to definite rights and duties of the lessor and the lessee, party a and party b agree to sign this office lease agreement after negotiation.第一条办公室座落、间数、面积、面积计算

  article 1: location, amount, area of the room and its calculation

  甲方向乙方提供甲方货运站内 楼no. 房间,使用面积

  平方米,作为其在货运站的操作办公用房。

  party a shall provide party b with room(s) of no. with the utility area of

  square meters as party b’s operation office in pactl.第二条办公室配套设施及服务

  article 2: auxiliary equipment and service

  甲方将以办公室的目前自然状况交与乙方,并提供以下货运站内办公室配套设施的使用及服务:

  party a shall hand over the room(s) at the present natural condition to party b, and provide the facilities use and services in pactl as follows:

  1.公共照明

  illumination power supply

  2.自来水(饮用水除外)

  running water (not including drinking water)

  3.空调设备

  air condition equipment

  4.公共卫生间

  public toilets

  5.公共区域清洁

  cleaning in public area乙方同意按其办公室内独立的电表读数和上海市物价局规定的电费价格,支付每月的用电费用。

  party b agrees to pay electricity fee monthly according to the electricity price regulated by shanghai pricing bureau and the readings of separate ammeter for its office.第三条租赁期限

  article 3: lease term

  1.租赁期共 年零 月,出租方从 年 月 日起将出租办公室交付承租方使用,至 年 月 日收回。

  lease term is (years) (months). party a shall hand over the rooms to party b on and take them back on .2.任何一方终止合同或变更合同内容,均需提前60天书面通知对方, 否则, 本合同被视为自动延续。

  each party has to furnish the other party at least 60 days with prior written notice for termination or change in this agreement, otherwise this agreement shall be deemed to extend automatically.第四条权利和义务

  article 4: rights & duties

  1.租赁期内,乙方应遵守《上海市民用机场地区管理条例》及有关货运区的运行、安全等管理条例;

  during the term of this contract, party b should comply with the bylaw << shanghai regional administration regulations of civil airport >>, the administrative rules and regulations regarding to cargo terminal operation & security.2.乙方对其租赁办公室区域内所有财产实施管理,并对其安全负责。甲方对该区域内属于乙方的财产的损坏、灭失等不承担责任,除非该损失是由于甲方的疏忽或故意行为造成的。

  party b should hold the responsibility for management and security of all its properties in the office leased by party b. party a shall not be liable for any loss of and damage to the properties that belong to party b, unless such loss or damages are caused due to negligence or willful misconduct of party a.3.乙方有下列情形之一的,甲方可以终止合同、收回办公室:

  if any of the situations mentioned below occurs, party a has the right to terminate the agreement and take the office back.

  (1)乙方擅自将所租赁办公室转租、转让或转借的;

  party b rents, or sells or lends the office to third party without party a’s permission.

  (2)乙方利用承租办公室进行非法活动,损害公共利益的;

  party b uses the renting office for illegal activities and harms the public benefits.

  (3)乙方拖欠租金累计达 3 个月的;

  party b delays payment for 3 months.

  (4)乙方有本合同第六条所涉及的甲方所不允许的行为的。

  party b has activities that party a does not permit as in article 6.4.合同期满后,如甲方仍继续出租办公室的,乙方享有优先权。如乙方无故逾期不搬迁,由此给甲方造成的一切损失由乙方承担。

  party b will have priority to lease if party a continues to rent out the office when this contract expires. if party b delays to move out at the end of lease term without acceptable reasons, party b will bear all loss caused to party a.第五条租金、物业管理费、电费以及交纳期限

  article 5: rent, property management fee, electricity fee and payment

  1.租金:每平方米 220.00元/月,总计 元/月。

  the rent shall be cny 220.00 per square meter per month based on utility area with the total rent of cny .2.物业管理费:每平方米 5.00元/月,总计 元/月。甲方有权根据市场物价指数,每年上调该物业管理费不大于15%。

  property management fee is cny5.00 per square meter per month, totally cny . party a has the right based on the pricing index to increase with certain amount (not surpass 15%).3.租金及物业管理费的交纳期限:乙方同意租金按季度于每季度的第一个月的10日前提前交付于甲方指定帐户内。

  payment of rent and property management: party b agrees to transact the payment to bank account appointed by party a before 10th of the first month for each quarter.4.电费的交纳期限:甲乙双方商定,除非另有约定,在每月的最后一天共同核定电表读数,然后由甲方向乙方发出付款通知书,乙方在收到该通知后的7个工作日内将该月的电费交付于甲方指定帐户内。

  payment of electricity fee: unless otherwise mutually agreed by the parties, party a and party b together confirm the reading of ammeter on the last day of each calendar month, then party a issue party b a payment statement. party b will pay the electricity fee to the bank account appointed by party a within 7 working days upon the receipt of the statement.(帐号:上海浦东发展银行空港支行 0763894135002616)。

  (account no.: shanghai pudong development bank shanghai konggang subbranch, 0763894135002616)第六条办公室的装修及使用

  1.乙方如对办公室进行装修时,不得擅自改变办公室结构和原有风格,并在装修前向甲方提交办公室装修方案(内容包括:设计图、所使用的装修材料、装修中使用的设备等),在获得甲方的书面同意后,装修方可进行,但甲方不得无理拒绝签发同意书。

  party b shall not change the structure and original style of the office during decoration without party a’s written consent. party b is required prior decoration to render to party a a statement detailing the office decoration scheme, including design drawing, decoration materials, list of equipment to be used and so on. only with written consent from party a, which shall not be unduly withheld, can the decoration be carried out.2.乙方如对办公室进行装修时,不得擅自改变办公室内的电源、通讯等线路和空调、喷淋等各种管路的原有走向,如确因使用电脑或其它办公设备而需增加电源插座时,应在装修方案中列明,获允许后方可施工,施工完毕后由甲方查验。如有损坏,除负责修复外,还应对造成的后果承担全部责任。

  party b shall not change the power supply and communication lines, pipelines for airconditioner and sprinkler without permission of party a during decoration. however, if some additional power outlets for computers and other office equipment will really be installed, they should be listed in the office decoration scheme, and only with party a’s permission can the decoration be carried out, which must be checked by party a after the completion of the decoration. if any damage occurs to those facilities, party b should repair the facilities at its own cost and be responsible for any consequence of these damages.3.鉴于办公室和地坪承载负荷限制,乙方如对办公室进行装修时,不得使用花岗石、大理石等重质材料作为地面装饰。

  considering the bearing capacity of the floor, party b shall not use any heavy materials, such as granite and marble, to decorate the floor.4.为保持整个货运站建筑和装饰的.统一性,乙方在进行办公室装修时,不得擅自变换办公室原有的门、窗及其外部颜色。

  in order to keep the unity of the architecture and decoration of the whole cargo terminal, party b shall not change the doors, windows and their exterior color without permission from party a during decoration.5.鉴于甲方已为乙方提供了空调设备,乙方在进行办公室装修时或办公室使用过程中,不得再安装任何形式的空调设备或取暖装置。乙方同意,在办公室租用期间,不使用单体耗电量超过300瓦的电气设备,每个接电插座用电容量不超过10安培,以确保货运站的用电安全。

  since party a has provided aircondition equipments to party b, party b shall not install any other airconditioner or heating device when decoration or in duration of the office leased. to ensure the electrical safety of the cargo terminal, party b agrees not to use electric appliances with power consumption surpassing 300w in single, and capacity of each electricity outlet is no larger than 10 a.6.乙方同意不论何种原因致使乙方中止本合同,乙方在迁离货运站时,不得对原属于甲方所有的固定设备或装置造成损坏,并负责将所租用办公室恢复至租赁前原样,但办公室的正常损耗除外。

  party b agrees that, when party b terminates the agreement, no matter whatever reason will be, party b shall not damage the fixed facilities or equipment owned by party a and be liable to restore the office leased to its original shape and state, normal wear and tear accepted, when withdrawing from the cargo terminal.第七条违约责任

  article 7: responsibility of agreement violation

  1.甲方未按前述合同条款的规定和按时向乙方交付合乎要求的办公室或有其他违约事项的,负责赔偿违约金为租赁期全部租金的10%。

  party a shall pay 10%(ten percent) of the annual total rent as compensation to party b in the event party a fails to hand over the lease office to party b at due time specified in articles hereof or has other performance that violates the agreement.2.承租方逾期交付租金或有其他违约事项的,应支付违约金为租赁期全部租金的10%。

  party b shall pay 10%(ten percent) of the annual total rent as compensation to party a in the event party b delays payment of rent or has other performance that violates the agreement.第八条免责条件

  article 8: liabilityfree condition

  办公室如因不可抗力的原因导致毁损和造成承租方损失的,双方互不承担责任。

  party a and party b shall not be responsible for each others’ losses arising from the damage to the office leased and/or property owned by party b caused by force majeure.第九条争议的解决方式

  article 9: settlement of dispute

  本合同在履行中如发生争议,双方应协商解决;协商不成时,任何一方均可依据中华人民共和国仲裁法向上海市仲裁委员会提请仲裁。仲裁结果将为最终结果,对双方均有约束力。

  any dispute occurring in the term of this agreement should be settled through negotiation. if it cannot be settled after negotiation, either party can, in compliance with the arbitration law of prc, apply for arbitration in shanghai arbitration committee. the arbitration award shall be final and binding on both parties.第十条 本合同未尽事宜,一律按《中华人民共和国合同法》的有关规定,经合同双方共同协商,作出补充规定,补充规定与本合同具有同等效力。

  article 10: any matters not stipulated in this agreement shall be settled in the addendum after mutual negotiation between party a and party b as per the relevant regulations in the “contract law of prc”. the addendum and the agreement shall be equally authentic.第十一条 本合同正本采用中英文两种文字混合,一式2份,出租方、承租方各执1份,两种文字具有同等法律效力。两种文字如有不符,以中文文本为准,经双方签字后正式生效。

  article 11: this agreement is executed in 2 (two) originals (mixture of english and chinese), 1 (one) for each party. the two languages have the same legal effects, and chinese version will prevail if any conflicts existing between two language contents. this agreement shall become effective on the date of execution.签约方 :

  parties

  pactl west

  签约地:

  place签字:

  signature

  签字人:

  signerbettina ganghofer

  职务:

  title付总经理/deptuty genertal manager

  签约日期:

  date

英文合同 篇7

  编号: no:

  日期: date :

  签约地点: signed at:

  卖方:sellers:

  地址:address: 邮政编码:postal code:

  电话:tel: 传真:fax:

  买方:buyers:

  地址:address: 邮政编码:postal code:

  电话:tel: 传真:fax:

  买卖双方同意按下列条款由卖方出售,买方购进下列货物:

  the sellers agrees to sell and the buyer agrees to buy the undermentioned goods on the terms and conditions stated below:

  1 货号 article no.

  2 品名及规格 description&specification

  3 数量 quantity

  4 单价 unit price

  5 总值:

  数量及总值均有_____%的增减,由卖方决定。

  total amount

  with _____% more or less both in amount and quantity allowed at the sellers option.

  6 生产国和制造厂家 country of origin and manufacturer

  7 包装: packing:

  8 唛头: shipping marks:

  9 装运期限:time of shipment:

  10 装运口岸:port of loading:

  11 目的口岸:port of destination:

  12 保险:由卖方按发票全额110%投保至_____为止的_____险。

  insurance:to be effected by buyers for 110% of full invoice value covering _____ up to _____ only.

  13 付款条件:

  买方须于_____年_____月_____日将保兑的,不可撤销的,可转让可分割的即期信用证开到卖方。 信用证议付有效期延至上列装运期后15天在中国到期,此时该信用证中必须注明允许分运及转运。

  payment:

  by confirmed, irrevocable, transferable and divisible l/c to be available by sight draft to reach the sellers before ___/___/_____ and to remainvalid for ingotiation in china until 15 days after the aforesaid time of shipment. tje l/c must specify that transhipment and partial shipments are allowed.

  14 单据:documents:

  15 装运条件:terms of shipment:

  16 品质与数量、重量的异义与索赔:quality/quantity discrepancy and claim:

  17 人力不可抗拒因素:

  由于水灾、火灾、地震、干旱、战争或协议一方无法预见、控制、避免和克服的其他事件此时导致不能或暂时不能全部或部分履行本协议,该方不负责任。但是,受不可抗力事件影响的.一方须尽快将发生的事件通知另一方,并在不可抗力事件发生15天内将有关机构出具的不可抗力事件的证明寄交对方。

  force majeure:

  either party shall not be held responsible for failure or delay to perform all or any part of this agreement due to flood, fire, earthquake, draught, war or any other events which could not be predicted, controlled, avoided or overcome by the relative party. however, the party affected by the event of force majeure shall inform the other party of its occurrence in writing as soon as possible and thereafter send a certificate of the event issued by the relevant authorities to the other party within 15 days after its occurrence.

  18 仲裁:

  在履行协议过程中,如产生争议,双方应友好协商解决。若通过友好协商未能达成协议,则提交中国国际贸易促进委员会对外贸易仲裁委员会,此时根据该会仲裁程序暂行规定进行仲裁。此时该委员会决定是终局的,对双方均有约束力。仲裁费用,除另有规定外,由败诉一方负担。

  arbitration

  all disputes arising from the execution of this agreement shall be settled through friendly consultations. in case no settlement can be reached, the case in dispute shall then be submitted to the foreign trad arbitration commission of the china council for the promotion of international trade for arbitration in accordance with its provisional rules of procedure. the decesion made by this commission shall be regarded as final and binding upon both parties. arbitration fees shall be borne by the losing party, unless otherwise awarded.

【英文合同】相关文章:

英文合同06-30

关于英文合同07-27

英文翻译合同03-02

【推荐】英文合同4篇04-26

英文合同合集10篇04-26

关于英文合同4篇04-24

英文合同集合8篇04-29

【精品】英文合同四篇05-03

有关英文合同四篇04-27

实用的英文合同4篇04-28