英文合同

时间:2023-05-23 18:09:46 合同 我要投稿

关于英文合同范文合集十篇

  在人民愈发重视法律的社会中,人们运用到合同的场合不断增多,签订合同可以明确双方当事人的权利和义务。那么制定合同书有什么需要注意的呢?下面是小编收集整理的英文合同10篇,希望能够帮助到大家。

关于英文合同范文合集十篇

英文合同 篇1

  合同 CONTRACT

  日期:合同号码:

  Date: Contract No.:

  买方: (The Buyers) 卖方: (The Sellers)

  兹经买卖双方同意按照以下条款由买方购进,卖方售出以下商品:

  This contract is made by and between the Buyers and the Sellers; whereby the Buyers agree to buy and the Sellers agree to sell the under-mentioned goods subject to the terms and conditions as stipulated hereinafter:

  (1) 商品名称:

  Name of Commodity:

  (2) 数量:

  Quantity:

  (3) 单价:

  Unit price:

  (4) 总值:

  Total Value:

  (5) 包装:

  Packing:

  (6) 生产国别:

  Country of Origin :

  (7) 支付条款:

  Terms of Payment:

  (8) 保险:

  Insurance:

  (9) 装运期限:

  Time of Shipment:

  (10) 起运港:

  Port of Lading:

  (11) 目的港:

  Port of Destination:

  (12)索赔:在货到目的口岸45天内如发现货物品质,规格和数量与合同不符,除属保险公司或船方责任外,买方有权凭中国商检出具的检验证书或有关文件向卖方索赔换货或赔款。

  Claims:

  Within 45 days after the arrival of the goods at the destination, should the quality, Specifications or quantity be found not in conformity with the stipulations of the contract except those claims for which the insurance company or the owners of the vessel are liable. The Buyers shall, have the right on the strength of the inspection certificate issued by the C.C.I.C and the relative documents to claim for compensation to the Sellers.

  (13)不可抗力:由于人力不可抗力的.原由,发生在制造、装载或运输的过程中导致卖方延期交货或不能交货者,卖方可免除责任,合同范本《英文买卖合同》。在不可抗力发生后,卖方须立即电告买方及在14天内以空邮方式向买方提供事故发生的证明文件,在上述情况下,卖方仍须负责采取措施尽快发货。

  Force Majeure:

  The sellers shall not be held responsible for the delay in shipment or non-deli-very of the goods due to Force Majeure, which might occur during the process of manufacturing or in the course of loading or transit. The sellers shall advise the Buyers immediately of the occurrence mentioned above the within fourteen days there after. The Sellers shall send by airmail to the Buyers for their acceptance certificate of the accident. Under such circumstances the Sellers, however, are still under the obligation to take all necessary measures to hasten the delivery of the goods.

  (14)仲裁:凡有关执行合同所发生的一切争议应通过友好协商解决,如协商不能解决,则将分歧提交中国国际贸易促进委员会按有关仲裁程序进行仲裁,仲裁将是终局的,双方均受其约束,仲裁费用由败诉方承担。

  Arbitration:

  All disputes in connection with the execution of this Contract shall be settled friendly through negotiation

英文合同 篇2

  Employment Contract

  甲方(用人单位):

  Party A:

  地址:

  法定代表人:

  乙方(劳动者):

  Party B:

  身份证号码:

  ID No:

  住址:

  依照《中华人民共和国劳动法》有关规定,结合本公司实际,甲乙双方本着平等、自愿、协商一致的原则达成如下协议

  According to the Labor Law of PRC China, Party A and Party B agree as follows:

  一、合同期限 Contract Period

  本合同期______年__ 月 __日起至______年 ___月___日或本合同约定终止条件出现时止。

  This agreement is valid from (Y/M/D) until (Y/M/D) or terminated by either party

  二、工作内容和工作时间 Responsibility & working hours

  1. 甲方聘请乙方担任 部门 职务,详见职务说明书。

  Party B's Department: Party B's position:

  Please refer to the job description for details.

  2. 乙方须完成甲方安排的生产(工作)任务

  Party B must accomplish his/her regular work and additional assignments on time

  3. 每天工作8小时,每周工作共40小时。

  There are 8 working hours a day, 40 working hours a week.

  4. 甲方如因业务拓展变化需要对乙方的工作岗位及工作区域进行调整,乙方应当接受。如因甲方公司业务扩展需要或公司合并分立等变更,乙方同意按照法律规定延续此合同,并接受甲方安排,在____(某地区)工作。

  If Party A needed to adjust Party B’s position and working area for business development variety, Party B should accept it.

  三、工资 Salary

  乙方每月的基本工资:RMB 绩效工资:RMB 综合福利金:RMB ,工资总额为RMB 元(该金额尚未扣除税金、住房费用以及社会保险中个人应缴的部份),另甲方予以乙方工资总额7%的住房公积金(如法律规定住房公积金缴交基数有上限,则依照法规执行)。试用期满,经考核后,根据考核结果确定是否正式录用,正式录用后薪金保持不变。甲方将视公司的盈利情况和乙方的考核结果,于每年的三月份进行薪金调整。

  Party B's monthly total revenue (before the deduction of tax, housing fund, social insurance paid by individual) each month would be RMB______ , including base wage RMB______ performance salary RMB_______and social welfare RMB______, And Party A will offer Party B 7% housing fund base on the total revenue, or any upper limit set by the local authority, whichever is the lower. After probation total revenue would be unchanged. Party B's salary will be reviewed annually in March and adjusted in light of Party B's performance and prevailing conditions.

  四、工资的发放 Payment

  甲方于每月_____日前通过银行转帐支付发放上月工资。

  Salary will be paid to Party B's account by T/T before the ____th of the following month.

  五、超时工作 Over Time

  乙方应致力于提高工作效率,按时完成生产、工作任务。如因特殊情况需要加班,可自行安排。如乙方希望通过自行安排加班取得加班费,则乙方必须在加班前四小时填写加班申请表呈总经理审批。否则,视为无效加班,详见《员工手册》。

  Party B must try his best to increase the working efficiency to meet Party A's requirement. If there are special circumstances that Party B has to work overtime, Party B can arrange by themselves. If Party B requests OT payment, he/she must fill in the OT application form and have it approved by GM. OT Application Form without authorized signature is not valid.

  六、加班费 OT Compensation

  乙方经甲方批准在工作日加班,甲方必须支付给乙方基本工资150%的报酬;休息日被安排工作而甲方又不能够给予乙方同等时间的补休,则甲方须支付给乙方基本工资200%的报酬;若在国家法定休假日被安排工作,甲方付给乙方基本工资300%的报酬。

  If Party B works over time and has approved by Party A, he/she will be offered the same period of compensation leave or OT salary according to Labor Law of PRC China.

  七、假期与福利 Holiday & Benefits

  1. 有薪国家法定假日 Statutory Holiday of PRC China with pay

  2. 有薪婚假/产假/丧假 Leave for Marriage, Maternity and Mourning with pay.

  3. 有薪年假 Annual leave with pay

  4. 社会保险 Social Insurance

  5. 年度奖金Annual bonus (based on the months worked with party A at the rate of one month’s wage for each full year worked. )

  详情请参照《员工手册》Please refer to Party A's employee manual for detail info.

  八、劳动纪律 Discipline

  乙方应严格遵守甲方制定的各项规章制度和劳动纪律(详请请参照《员工手册》执行)

  Party B shall strictly obey Party A’ regulations and discipline. Please refer to Party A's employee manual.

  九、保密协议 Confidentiality

  乙方需严格保守工作过程中接触和了解到的公司商业秘密(包括生产技巧、工艺流程、技术秘密、管理方法、产销策略、货源情报、设计图纸、成本价格和客户资料),否则将受到行政处罚(如无条件解雇、赔偿等);触犯刑法的,甲方将有权移交司法机关处理。乙方调离甲方,应得到甲方同意,并将所有商业秘密资料移交甲方,同时承担不向外泄露的义务,并保证半年内不得利用甲方商业秘密在生产同类且与甲方有竞争关系的产品的其他企业内任职。否则,甲方有权要求乙方赔偿因此而带来的一切经济损失。

  The recipient shall undertake the obligation to keep confidential, in accordance with the scope and duration agreed upon by both parties, the technical secrets contained in the technology provided by the supplier, which have not been made public.

  十、合同终止 Termination

  1. 终止本合同条件 Termination conditions

  A. 试用期间,双方皆可即时通知对方解除本合同;

  During the probation period, either side can terminate the contract by immediate effect.

  B. 试用期满后,任何一方欲解除合同,须提前三十日以书面形式通知对方。否则,违约方须向守约方支付违约金(违约金为乙方一个月的.工资),若造成守约方经济损失的,应依法承担赔偿责任。

  Either side can terminate the contract by giving 30 days notice in written form after probation period.

  2. 甲方在下列情况下可随时直接地通知乙方解除本合同,无须履行任何法定义务和手续,无须向乙方补偿If any case of the following circumstances, Party A has the right to inform Party B rescission of the contract:

  A. 乙方在试用期间达不到甲方的要求;Party B’s performance can’t meet Party A’s requirement.

  B. 乙方严重失职,给甲方利益造成重大损失的;

  The other party has breached the contract, to the extent that such breach has seriously affected the economic benefits expected when concluding the contract

  C. 违反甲方有关规定,应予开除的,详情请参照《员工手册》执行。The condition agreed on in the Party A's employee manual for rescission of the contract has arisen

  3. 乙方在下列情况下终止本合同不需向甲方补偿

  If any one of the following circumstances, Party B has the right of inform Party A rescission of the contract without any compensation:

  A. 被非法限制人身自由的手段强迫劳动的;

  Party B is forced to work by illegal means.

  B. 未按本合同约定支付劳动报酬或劳动条件的;

  Party B cannot get the salary or working conditions which agreed in the contract.

  十一、甲、乙双方须共同遵守国家有关法规以及甲方《员工手册》的有关规定。

  Both Party A and Party B shall obey the related regulation of PRC China and Party A's employee manual.

  十二、本合同自甲方盖章、乙方签署之日起生效。

  This contract shall come into effect since both sides sign their names.

  十三、本合同以中文版本为准,合同一式二份,甲、乙双方各执一份。

  N.B. In case of divergence, the Chinese texts shall be regarded as authentic. Two originals, one for Party A, the other one for Party B.

  甲、乙双方签署同意以上条款The above terms is agreed by:

  甲方(Party A): 签署日期(Date):

英文合同 篇3

  The buyer: the seller: ____________ ____________

  Address: Address: ____________ ____________

  Tel: ____________ Tel: ____________

  Fax: Fax: ____________ ____________

  Contact: Contact: ____________ ____________

  The sale of the friendly negotiation of both parties, the buyer seller commissioned processing production ________ mould Co ______ set. The two sides reached the following processing agreement

  Basic mould of die:

  Product name serial number part name point number (mold type) mold single price (RMB yuan) delivery condition

  Total price: (including 17% VAT)

  The above set of mould material: _____________________

  (the above mold materials are provided by the seller).

  I. The rights and responsibilities of the two parties:

  Buyer's responsibility and rights are as follows:

  1. the buyer is responsible for the delivery of the R & D requirements and plans of the seller's project, and provides the sales forecast as far as possible.

  2. the buyer is responsible for the delivery of the product design drawings and other related technical information required by the seller to the seller and the technical support.

  3., the buyer has the sole right to interpret the product design drawings and related technical data delivered to the seller. When there is ambiguity, the Seller shall consult the buyer's opinion and confirm it by the buyer.

  4. after the seller completes the design and manufacture of the mould, the buyer will go to the seller's site to verify the mold, or to provide the product sample to the buyer for confirmation and confirmation by the seller. The moulds referred to in this contract include the mould of the product itself and the fixture and mould needed for the subsequent production.

  The rights and responsibilities of the seller are as follows:

  1. the seller is responsible for the design and manufacture of the moulds according to the product design drawings and other related technical information provided by the buyer.

  Be responsible for completing the mold according to the buyer's design requirements in accordance with the stipulations of the contract.

  2. the Seller shall be responsible for providing timely certification and sample test, trial production of desired products. At the same time the seller must provide the details of the related products.

  The detailed test report is for the buyer's confirmation. In case of repair / modification, the test report is also attached at the same time.

  The buyer does not bear any responsibility.

  1.5 the Seller shall give the buyer the corresponding compensation in the form of the buyer's approval as the seller causes the buyer to spend the labor and cost outside the normal technical support as a result of the seller's cause.

  2. the progress of the model:

  2.1 the seller after the receipt of the buyer after the confirmation of product drawing, which began to enter the mold design and production stage, open cycle for ________ days

  2.2 due to buyer's cause the delay of mold making progress is not calculated.

  2.3 if the seller's mold making process and other mistakes lead to the failure of the mold to be accepted and the buyer is in urgent need of production.

  At the same time, the production should be arranged with the existing mold, and the die should be reopened according to the requirements of the drawings and samples.

  3. mode of payment:

  Party B agrees that Party A will pay the payment as follows.

  3.1 separate settlement: Monthly knot, 60 days after the opening of the ticket, open 17% VAT invoices.

  3.1.1 of the total amount of the contract manufacturing batch mould (including VAT) for RMB _________ yuan (RMB ________ yuan), the buyer to pay the total amount of _____% mold, mold ___% residual cost allocation in the first 50K products, if the number of orders less than 50K, the buyer shall supply the seller after the unamortized tooling cost.

  3.1.2 from the two sides after the signing of the contract, the seller to provide value-added tax invoices (mold total ____%), the buyer within twenty working days of payment.

  4. product order: only after the quality acceptance of the product sample is qualified and the buyer's written confirmation, the seller may accept the order of the third party authorized by the buyer or the buyer. The order contract signed by third parties authorized by the buyer with the buyer's seller is subject to this contract.

  Four, product quality assurance

  After the seller has completed the mold, the Seller agrees to guarantee the quality of the product in accordance with the buyer's quality standard (the first confirmation report).

  The buyer reserves the right to modify the content of the quality standard in accordance with the actual needs.

  Five. The ownership of the mold

  1. the ownership of all moulds and clamping fixtures and their assembly drawings and parts drawings (including 2D and 3D) involved in the contract shall be owned by the buyer, and the Seller shall not interfere with the buyer's disposition of the molds. If the seller is responsible for the custody of the seller, the Seller shall not supply the mould to the third party without the buyer's consent, otherwise the buyer shall have the right to ask the seller to return the mold fee and compensate for the loss.

  2. when the buyer pays the mold cost, the seller must cooperate with the buyer or the third party designated by the buyer to transfer the inspection and accept the replacement of the die from the seller's place, and will replace the worn parts at the expense of itself, so as to ensure the restart of production. The seller is obliged to assemble, rust and pack the moulds and send it to the place designated by the buyer. All mold assembly drawings and part drawings (including 2D and 3D) and all clamping devices must be transferred to the buyer at the same time.

  3., during the process of mold transfer, such as the improper assembly, rust prevention or packaging of the seller, it will cause damage to the mold, and all direct and indirect losses arising therefrom shall be borne by the seller.

  Six, mold maintenance

  1., the Seller guarantees the service life of the mould 500 thousand times, and the seller is responsible for free maintenance during this period. If the mold is not used during the service life, the Seller shall be responsible for changing or re opening the mold and taking the corresponding cost.

  2. the seller should die changes, maintenance and repairs in a timely manner and register, whether such a modification, maintenance and repair are

  The buyer made it. If the buyer is to ask the relevant technical details or evidence, the buyer may register with the time without notice. The Seller shall give the buyer a copy of the record once every three months. The seller should take the initiative to complete this task on a regular basis without the buyer's request.

  Six. Intellectual property rights

  The product and the buyer 1. involved in this contract to provide design drawings and other information in the intellectual property is owned by the buyer, the buyer without permission, the Seller shall not disclose to any company or individual, otherwise all the losses resulting from the seller; the buyer only agreed to all data and information provided by the seller by the buyer the purpose of this contract based on the,

  2. the Seller agrees to the design drawings will not be provided by the buyer and other data or information for the purpose of non contract other than the seller or the buyer has the right to pursue responsibility; without written permission from the buyer, the Seller shall not in publications, advertising or other written and oral form to the seller to provide or have provided any data and information.

  3., without the buyer's license, it is strictly prohibited for the seller to use this mould to supply other customers other than the buyer or the buyer's designated customer, otherwise all direct and indirect losses arising from it shall be the seller's responsibility.

  4. other undisclosed matters of confidentiality are carried out in accordance with the "confidentiality agreement" signed by the buyer and the seller.

  Seven. Liability for breach of contract

  1. the Seller shall be liable for breach of contract if the seller fails to complete the mold making and sample delivery according to the progress of each stage specified in the 2.1. The Seller shall pay the buyer a fine of 2% of the total amount of this contract at a time of one day of delay. The amount of the penalty is not more than the total amount of the contract.

  2., if the seller's cause causes the seller's quality to be supplied to the buyer can't meet the buyer's requirements, and the other materials will be lost and scrapped during the assembly process, the seller will fully compensate for the loss and scrap materials and the resulting artificial / stop line costs. The two parties may sign separately the raw material for production.

  3. the quality and progress of the product provided to the buyer by the seller for the seller's cause can not reach the buyer.

  Place)

  3. when the mold is certified by the buyer, the seller is responsible for the seal of the mold. If the buyer agrees that the seller is responsible for the subsequent processing and production of the products, the Seller shall be responsible for the repair and maintenance of the moulds, and the Seller shall make the batch production according to the order of the third party authorized by the buyer or the buyer.

  4. for all the molds produced by the buyer, the Seller shall provide the buyer with detailed design drawings. All drawings must be made in AutoCAD or pro-eng (pro-el2) and must be transmitted to the buyer in electronic form before the mold opening for approval.

  Two. Technical terms:

  1. repair and maintenance of the mold: the seller is responsible for the repair and maintenance of the mold during the production process.

  2., after no dispute between the two sides, the buyer will provide the product design drawings and related technical information to the seller, and send the engineer to the seller's technical exchange or the seller send the engineer to the buyer for technical communication. The product drawings and technical requirements list is attached to Annex 1.

  3. the seller promised to use the quality requirements of the mold for the system to produce products to the buyer

  4. the seller promised to use the mold for the system to produce the product can reach the seller's delivery capacity:

  Nissan energy: _______k, monthly capacity: ______k

  5. the seller promises that all the moulds involved in this contract can be reached to 400 thousand times.

  6., without the buyer's permission, it is strictly prohibited for the seller to contract the whole part of the contract involved in the contract to other companies for processing. Otherwise, the Seller shall be liable for breach of contract in accordance with the breach clause of the contract as a breach of contract.

  Three. The terms of business:

  1. mold price:

  1.1 after negotiation between the two parties, the seller will provide the final offer of the mould approved by the buyer and sign the price confirmation as an indispensable part of the contract.

  The total amount of 1.2 contract (including VAT mold ____%) rmb_______.

  1.3 the total cost of the price of the mold contains the following expenses, and the Seller shall not ask the buyer for the following reasons:

  1.3.1 the cost of all the fixtures and tools required by the seller for the molding / two processing / assembly of the product;

  1.3.2 the seller, according to the contract, carries out the cost of material, equipment and manpower for mould design, test mould.

  1.3.3 the cost of the sample (800 sets) provided by the seller to the buyer for the certification of the mold and product;

  1.3.4 the seller is the cost of the die vulnerable spare parts to ensure the normal production of the mold;

  1.3.5 the cost of the related tools and tools for other processes that are prepared for the normal production of the product.

  1.4 when the written request of the buyer the seller according to the change of the product design for the mould modification, if the mould modification is relatively simple, including less mold material changes and other simple changes from the mold, the seller to the buyer without charges; if the modification is complex, great influence on the whole structure of the mold, then the seller according to the modified working hours for mold to the buyer by the buyer offer, the corresponding mold modification cost. The buyer shall not bear any responsibility for the repair or modification of the mold due to the seller's reason, due to the failure of the mold to meet the buyer's requirements.

  1.5 by the seller to the buyer's manual and cost technical support from the normal cost, the Seller shall give the buyer recognized the way the corresponding compensation.

  2. the progress of the model:

  2.1 after the seller has received the product drawing file after the buyer's confirmation, that is,

  The cost of artificial / stop line formation. The two parties may sign separately the raw material for production.

  3. if the seller has caused the seller to the buyer of the product quality and schedule is not up to the requirements of the buyer, the buyer and customer missed the best time to market, or the buyer was forced to cancel the project, so that the buyer and its customers suffer serious losses and loss of material research, in addition to the seller to refund all previous the buyer to pay the purchase price, depending on the actual situation of the seller also bear the buyer direct and indirect economic losses.

  4., if the seller is unable to resist force, including the war, fire, strike, and other force majeure caused by Chinese law, the buyer will allow the buyer to dismiss it. The Seller shall notify the buyer in written form within 24 hours after the occurrence of the force majeure, and the seller is obliged to take all necessary measures to deliver the goods as soon as possible. If the force majeure continues for more than 2 weeks, the buyer has the right to cancel this contract.

  5. other unfinished matters: implemented in accordance with the economic contract law.

  Eight. Dispute settlement

  Any dispute arising from the execution of this contract shall be settled through friendly negotiation first. If no negotiation can be reached within 30 days, either party can submit the dispute to the municipal court.

  The parties to this contract shall be strictly enforced. If one party fails to perform the contract in the cause of the contract, the party must ask for the consent of the other party two weeks in advance, and the contract shall be terminated.

  The buyer: the seller: ____________ ____________

  Representative: Representative: ___________ ____________

英文合同 篇4

  合 同 CONTRACT

  日期: 合同号码:

  Date: Contract No.:

  买 方: (The Buyers)

  Address/TEL/FAX/E-mail

  卖方: (The Sellers)

  Address/TEL/FAX/E-mail

  本合同双方,公司(以下称甲方)与(以下称乙方), 在平等互利基础上,通过友好协商,于 某年某月某日在中国(地址),特签订本合同

  This contract is hereby (特此) made and concluded by and between co.,(hereinafter referred to as party A) and Co.,(hereinafter referred to as party B) on (date),in (place), china, on the principle of equality and mutual benefit and through amicable(friendly) consultation 双方有争议,应首先通过友好协商解决

  All disputes arising from the execution of this agreement shall be settled through friendly consultations

  兹经买卖双方同意按照以下条款由买方购进,卖方售出以下商品:

  This contract is made by the Buyers and the Sellers; whereby the Buyers agree tobuy and the Sellers agree to sell the following goods subject to the terms and conditions as stipulated follow:

  (1) 商品名称、规格、质量Name of Commodity、specifications quality of commodity

  (2) 数 量:Quantity:允许----的溢短装 ---% more or less allowed

  (3) 单 价: Unit price:

  (4) 总 值:Total Value/ Total Amount

  (5) 包 装:Packing:

  货物应具有防潮、防锈蚀、防震并适用于海洋运输的包装,由于货物包装不良而造成的货物残损、灭失应由卖方负责。卖方应在每个包装箱上用不退色的颜色标明尺码、包装箱、毛重、净重、及“此端向上”“防潮”、“小心轻放”易碎fragile 等标记。

  The packing of the goods shall be preventive from dampness, rust, moisture, erosion and shock,( The packing of the goods must be well protected against dampness, moisture, rust, and be able to stand shock) and shall be suitable for ocean transportation/multiple transportation. The seller shall be liable for all damage and losses of the goods attributable to (caused by)the inadequate orimproper packing. The measurement , gross weight, net weight and the cautions such as “do not stack up side down”(this way up)”keep away from moisture” “handle with care”shall be stenciled (marked)on the surface of each package with fadeless pigment.

  (6) 生产国别:Country of Origin :

  (7) 支付条款:Terms of Payment:L/C、D/P、D/A、COD(cash on delivery)

  () 信用证式:买应在装运期前/合同生效后__日,开出以卖为受益人的不可撤销的议付信用证,信用证在装船完毕后__日内到期。

  Letter of Credit: The Buyer shall, ______ days prior to the time of shipment /after this Contract comes into effect, open an irrevocable Letter of Credit in favor of the Seller. The Letter of Credit shall expire ____ days after the completion of loading of the shipment as stipulated.

  () 付款交单:货物发运后,卖方出具以买方为付款人的付款跟单汇票,按即期付款交单(D/P)式,通过卖银行及_____银行向买转交单证,换取货物。

  Documents against payment: After shipment, the Seller shall draw a sight bill of exchange on the Buyer and deliver the documents through Sellers bank and ______ Bank to the Buyer against payment, i.e D/P. The Buyer shall effect the payment immediately upon the first presentation of the bill(s) of exchange.

  即期付款交单D/P at sight

  跟单汇票documentary draft

  Upon first presentation the Buyer shall pay against documentary draft drawn by the Seller at sight. The Shipping documents are to be delivered against payment only.

  买方应凭卖方开具的即期跟单汇票于见票时立即付款,付款后交单。

  () 承兑交单:货物发运后,卖出具以买为付款人的付款跟单汇票,付款期限为____后__日,按即期承兑交单(D/A__日)式,通过卖银行及______银行,经买承兑后,向买转交单证,买在汇票期限到期时支付货款。

  Documents against Acceptance: After shipment, the Seller shall draw a sight bill of exchange, payable_____ days after the Buyers delivers the document through Seller’s bank and _________Bank to the Buyer against

  acceptance (D/A ___ days). The Buyer shall make the payment on date of the bill of exchange.

  () 货到付款:买在收到货物后__天内将全部货款支付卖(不适用于FOB、CRF、CIF术语)。

  Cash on delivery (COD): The Buyer shall pay to the Seller total amount within ______ days after the receipt of the goods (This clause is not applied to the Terms of FOB, CFR, CIF).

  (8) 保 险:insurance:由----按发票金额110%投保--- 险和---附加险

  Insurance shall be covered by the ----for 110% of the invoice value against-----risks and additional risks

  (9) 装运期限: Time of Shipment:

  (10) 起 运 港:Port of Lading:

  (11) 目 的 港: Port of Destination:

  单据(Documents Required):

  卖应将下列单据提交银行议付/托收:

  The Seller shall present the following documents required to the bank for negotiation/collection:

  () 标明通知收货人/受货代理人的全套清洁的、已装船的.、空白抬头、空白背书并注明运费已付/到付的海运/联运/陆运提单。

  Full set of clean on board Ocean/Combined Transportation/Land Bills of Lading and blank endorsed marked freight prepaid/ to collect;

  () 标有合同编号、信用证号(信用证支付条件下)及装运唛头的商业发票一式__份;

  Signed commercial invoice in ______copies indicating Contract No., L/C No. (Terms of L/C) and shipping marks;

  () 由______出具的装箱或重量单一式__份;

  Packing list/weight memo in ______ copies issued by__;

  () 由______出具的质量证明书一式__份;

  Certificate of Quality in _______ c(转载于:www.773N.co m校 园生活 网:合同号码英文)opies issued by____;

  () 由______出具的数量证明书一式__份;

  Certificate of Quantity in ___ copies issued by____;

  () 保险单本一式__份(CIF 交货条件);

  Insurance policy/certificate in ___ copies (Terms of CIF);

  ()____签发的产地证一式__份;

  Certificate of Origin in ___ copies issued by____;

  () 装运通知(Shipping advice): 卖应在交运后_____小时内以特快专递式邮寄给买上述第__项单据副本一式一套。

  EMS邮政特快专递

  The Seller shall, within ____ hours after shipment effected, send by courier each copy of the above-mentioned documents No. __.

  一式两份:in duplicate; 一式三份:in triplicate;一式四份:in

  quadruplicate

  The fax contract has same force as effect as origin form

  本合同传真件具有法律效力

  运输方式:terms of delivery FOB/CFR/CIF

  () FOB交货式

  卖方应在合同规定的装运日期前天,以____式通知买合同号、品名、数量、金额、包装件、毛重、尺码及装运港可装日期,以便买安排租船/订舱。装运船只按期到达装运港后,如卖不能按时装船,发生的空船费或滞期费由卖负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

  The Seller shall, days before the shipment date specified in the Contract, advise the Buyer by _______ of the Contract No., commodity, quantity, amount, packages, gross weight, measurement, and the date of shipment in order that the Buyer can charter a vessel/book shipping space. In the event of(in case) the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus

英文合同 篇5

  编号: no:

  日期: date :

  签约地点: signed at:

  卖方:sellers:

  地址:address: 邮政编码:postal code:

  电话:tel:传真:fax:

  买方:buyers:

  地址:address: 邮政编码:postal code:

  电话:tel:传真:fax:

  买卖双方同意按下列条款由卖方出售,买方购进下列货物:

  the sellers agrees to sell and the buyer agrees to buy the undermentioned goods on the terms and conditions stated below:

  1 货号article no.

  2 品名及规格description&specification

  3 数量 quantity

  4 单价unit price

  5 总值:

  数量及总值均有_____%增减,由卖方决定。

  total amount

  with _____% more or less both in amount and quantity allowed at the sellers option.

  6 生产国和制造厂家country of origin and manufacturer

  7 包装:packing:

  8 唛头:shipping marks:

  9 装运期限:time of shipment:

  10 装运口岸:port of loading:

  11 目思的口岸:port of destination:

  12 保险:由卖方按发票全额110%投保至_____为止_____险。

  insurance:to be effected by buyers for 110% of full invoice value covering _____ up to _____ only.

  13 付款条件:

  买方须于_____年_____月_____日将保兑,不可撤销,可转让可分割即期信用证开到卖方。 信用证议付有效期延至上列装运期后15天在中国到期,该信用证中必须注明允许分运及转运。

  payment:

  by confirmed, irrevocable, transferable and divisible l/c to be available by sight draft to reach the sellers before ___/___/_____ and to remainvalid for ingotiation in china until 15 days after the aforesaid time of shipment. tje l/c must specify that transhipmeent and partial shipments are allowed.

  14 单据:documents:

  15 装运条件:terms of shipment:

  16 品质与数量、重量异义与索赔:quality/quantity discrepancy and claim:

英文合同 篇6

  (ORIGINAL)

  中国上海中山东一路27号 合 同 号 码

  27 Chuangshan Road (E.1.) Shanghai, ChinaContract No.

  买方:合 同 日 期:

  The Buyers:CONTRACT Date:

  传真:

  FAX:021—291730

  . 电 传 号:

  Telex number:TEXTILE

  兹经买卖双方同意,由买方购进,卖方出售下列货物,并按下列条款签订本合同:

  This CONTRACT is made by and between the Buyers and the Sellers;whereby the Buyers agree to buy and the

  Sellers agree to sell the undermentioned goods on the terms and conditions stated below:

  (1)货物名称、规格、包装及唛头 (2)数量 3)单价 (4)总值 (5)装运期限

  Name of Commodity, Specifications, QuantityUnit Price Total Amount Time of Shippment

  (6) 装 运 口 岸:

  Port of Loading:

  (7) 目 的 口 岸:

  Port of Destination :

  (8) 付 款 条 件:买方在收到卖方关于预计装船日期及准备装船的数量的通知后,应于装运前20天,

  通过上海中国银行开立以卖方为受益人的不可撤销的信用证。该信用证凭即期汇票及本合同第(9)条规定

  的单据在开证行付款。

  Terms of Payment:Upon receipt from the Sellers of the advice as to the time and quantify expected ready

  for shipment, the Buyers shall open, 20days before shipment, with the Bank of China ,Shanghai, an irrevocable

  Letter of Credit in favour of the Sellers payable by the opening bank against sight draft accompanied by the

  documents as stipulated in Clause (9) of this Contract.

  (9)单 据:各项单据均须使用与本合同相一致的文字,以便买方审核查对:

  Documents:To facilitate the Buyers to cheek up, all documents should be made in a version identical to that

  used in this contract.

  填写通知目的口岸对外贸易运输公司的空白抬头、空白背书的全套已装船的清洁提单。(如本合同为

  FOB价格条件时,提单应注明“运费到付”或“运费按租船合同办理”字样;如本合同为CFR价格条件时,

  提单应注明“运费已付”字样。)

  Complete set of Clean On Board Shipped Bill of Lading made out to order, blank endorsed, notifying the

  China National Foreign Trade Transportation Corporation ZHONGWAIYUN at the port of destination. (if the

  prise in this Contract is Based on FOB, marked “freight to collect” or “freight as per charter party”; if the price in

  this Contract is Based on CFR, marked “freight prepaid”.)

  B.发 票:注明合同号、唛头、载货船名及信用证号,如果分批装运,须注明分批号。

  Invoice:indicating contract number, shipping marks, name of carrying vessel, number of the Letter of Credit

  and shipment number in case of partial shipments.

  C. 装箱单及或重量单:注明合同号及唛头,并逐件列明毛重、净重。

  Packing List and/or Weight Memo:indicating contract number, shipping marks, gross and net weights of

  each package.

  D. 制造工厂的品质及数量、重量证明书。

  Certificates of Quality and Quantity/Weight of the contracted goods issued by the manfactures.

  品质证明书内应列入根据合同规定的标准进行化学成分、机械性能及其他各种试验结果。

  Quality Certificate to show actual results of tests to be made, on chemical compositions, mechanical

  properties and all other tests called for by the Standard stipulated heron.

  E. 按本合同第(11)条规定的装运通知电报抄本。

  Copy of telegram advising shipment according to Clause (11) of this Contract.

  F. 按本合同第(10)条规定的航行证明书。(如本合同为CFR价格条件时,需要此项证明书,如本合同

  为FOB价格条件时,则不需此项证明书。)

  Vessels itinerary certificate as per Clause (10) of this Contract, (required if the price in this Contract is based on CFR:not required if the price in this Contract is based on FOB.)

  份数 Number of 单证

  copiesDocuments

  寄送 AB C D E FTo be distributob

  送交议付银行(正本)3 4 3 311

  to the negotiating bank (original)

  送交议付银行(副本) 1

  to the negotiating bank (duplicate)

  空邮目的口岸外运公司(副本)2 3 2 2

  to ZHONGWAIYUN at the port of destination by airmail (duplicate)

  (10)装运条件

  Terms of Shipment :

  A. 离岸价条款 Terms of FOB Delivery:

  a) 装运本合同货物的船只,由买方或买方运输代理人中国租船公司租订舱位。卖方负担货物的一切费用风

  险到货物装到船面为止。

  For the goods ordered in this Contract, the carrying vessel shall be arranged by the Buyers or the Buyers

  Shipping Agent China National Chartering Corporation. The Sellers shall bear all the charges and risks until the

  goods are effectively loaded on board the carrying vessel.

  b) 卖方必须在合同规定的交货期限三十天前,将合同号码、货物名称、数量、装运口岸及预计货物运达装

  运口岸日期,以电报通知买方以便买方安排舱位。并同时通知买方在装港的船代理。倘在规定期内买方未

  接到前述通知,即作为卖方同意在合同规定期内任何日期交货,并由买方主动租订舱位。

  The Sellers shall advise the Buyers by cable, and simultaneously advise the Buyersshipping agent at the

  loading port, 30 days before the contracted time of shipment, of the contract number, name of commodity, quantity,

  loading port and expected date of arrival of the goods at the loading port, enabling the Buyers to arrange for

  shipping space. Absence of such advice within the time specified above shall be considered as Sellersreadiness to

  deliver the goods during the time of shipment contracted and the Buyers shall arrange for shipping space

  accordingly.

  c) 买方应在船只受载期12天前将船名、预计受载日期、装载数量、合同号码、船舶代理人,以电报通知

  卖方。卖方应联系船舶代理人配合船期备货装船。如买方因故需要变更船只或更改船期时,买方或船舶代

  理人应及时通知卖方。

  The Buyers shall advise the Sellers by cable, 12 days before the expected loading date, of the estimated laydays,

  contract number, name of vessel, quantity, to be loaded and shipping agent. The Sellers shall then arrange with the

  shipping agent for loading accordingly. In case of necessity for substitution of vessel or alteration of shipping

  schedule, the Buyers or the shipping agent shall duly advise the Sellers to the same effect.

  d) 买方所租船只按期到达装运口岸后,如卖方不能按时备货装船,买方因而遭受的一切损失包括空舱费、

  延期费及/或罚款等由卖方负担。如船只不能于船舶代理人所确定的受载期内到达,在港口免费堆存期满后

  第16天起发生的仓库租费,保险费由买方负担,但卖方仍负有载货船只到达装运口岸后立即将货物装船之

  义务并负担费用及风险。前述各种损失均凭原始单据核实支付。

  In the event of the Sellersfailure in effecting shipment upon arrival of the vessel at the loading port, all losses,

  including dead freight, demurrage fines etc. thus incurred shall be for Sellersaccount. If the vessel fails to arrive

  at the loading port within the laydays. previously declared by the shipping agent, the storage charges and insurance

  premium from the 16th day after expiration of the free storage time at the port shall be borne by the Buyers.

  However, the Sellers shall be still under the obligation to load the goods on board the carrying vessel immediately

  after her arrival at the loading port, at their own expenses and risks. The expenses and losses mentioned above

  shall be reimbursed against original receipts or invoices.

  B. 成本加运费价条款 Terms of CFR Delivery:

  卖方负责将本合同所列货物由装运口岸装直达班轮到目的口岸,中途不得转船。货物不得用悬挂买方

  不能接受的国家的旗帜的船只装运。

  The Sellers undertake to ship the contracted goods from the port of loading to the port of destination on

  adirect liner, with no transhipment allowed. The contracte goods shall not be carried by a vessel flying the flag of

  the countries which the Buyers can not accept.

  (11)装运通知:卖方在货物装船后,立即将合同号、品名、件数、毛重、净重、发票金额、载货船名及

  装船日期以电报通知买方。

  Advice of Shipment:The Sellers shall upon competition of loading, advise immediately the Buyers by cable

  of the contract number, name of commodity, number of packages, gross and net weights, invoice value, name of

  vessel and loading date.

  (12)保 险:自装船起由买方自理,但卖方应按本合同第(11)条通知买方。如卖方未能按此办理,买方因而遭受的一切损失全由卖方负担。

  Insurance:To be covered by the Buyers from shipment, for this purpose the Sellers shall advise the Buyers by cable of the particulars as called for in Clause(11) of this Contract, In the event of the Buyers being unable to arrange for insurance in consequence of the Sellersfailure to send the above advice, the Sellers shall be held responsible for all the losses thus sustained by the Buyers.

  (13)检验和索赔:货卸目的口岸,买方有权申请中华人民共和国国家质量监督检验检疫总局进行检验。如发现货物的品质及/或数量/重量与合同或发票不符:除属于保险公司及/或船公司的责任外,买方有权在货卸目的口岸后90天内,根据中华人民共和国国家质量监督检验检疫总局出具的证明书向卖方提出索赔,因索赔所发生的一切费用(包括检验费用)均有卖方负担。FOB价格条件时,如重量短缺,买方有权同时索赔短重部分的`运费。

  Inspection and Claim:The Buyers shall have the right to apply to the General Administration of Quanlity Supervision, Inspection and Quarantine of the Peoples Republic of China (AQSIQ) for inspection after discharge of the goods at the port of destination. Should the quality and/or quantity/weight be found not in conformity with the contract or invoice the Buyers shall be entitled to lodge claims with the Sellers on the basis of AQSIQ s Survey Report, within 90 days after discharge of the goods at the port of destination , with the exception, however, of those claims for which the shipping company and/or the insurance company are to be held responsible. All expenses incurred on the claim including the inspection fee as per the AQSIQ inspection certificate are to be borne by the Sellers. In case of FOB terms, the buyers shall also be entitled to claim freight for short weight if any.

  (14)不可抗力:由于人力不可抗拒事故,使卖方不能在合同规定期限内交货或者不能交货,卖方不负责任。但卖方必须立即通知买方,并以挂号函向买方提出有关政府机关或者商会所出具的证明,以证明事故的存在。由于人力不可抗拒事故致使交货期限延期一个月以上时,买方有权撤销合同。卖方不能取得出口许可证不得作为不可抗力。

  Force Majeure:In case of Force Majeure the Sellers shall not held responsible for delay in delivery or non-delivery of the goods but shall notify immediately the Buyers and deliver to the Buyers by registered mail a certificate issued by government authorities or Chamber of Commerce as evidence thereof. If the shipment is delayed over one month as the consequence of the said Force Majeure, the Buyers shall have the right to cancel this Contract. Sellersinability in obtaining export licence shall not be considered as Force Majeure.

  (15)延期交货及罚款:除本合同第(14)条人力不可抗拒原因外,如卖方不能如期交货,买方有权撤销该部分的合同,或经买方同意在卖方缴纳罚款的条件下延期交货。买方可同意给予卖方15天优惠期。罚款率为每10天按货款总额的1%。不足10天者按10计算。罚款自第16天起计算。最多不超过延期货款总额的5%。

  Delayed Delivery and Penalty:Should the Sellers fail to effect delivery on time as stipulated in this Contract owing to causes other than Force Majeure as provided for in Clause (14) of this Contract, the Buyers shall have the right to cancel the relative quantity of the contract, Or altenatively, the Sellers may, with the Buyersconsent, postpone delivery on payment of penalty to the Buyers. The Buyers may agree to grant the Sellers a grace period of 15 days. Penalty shall be calculated from the 16th day and shall not exceed 5% of the total value of the goods involved.

  (16)仲裁:一切因执行本合同或与本合同有关的争执,应由双方通过友好方式协商解决。如经协商不能得到解决时,应提交北京中国国际贸易促进委员会对外经济贸易仲裁委员会。按照中国国际贸易促进委员会对外经济贸易仲裁委员会仲裁程序暂行规定进行仲裁。仲裁委员会的裁决为终局裁决,对双方均有约束力。仲裁费用除非仲裁委员会另有决定外,由败诉一方负担。

  Arbitration:All disputes in connection with this Contract or the execution thereof shall be friendly negotiation. If no settlement can be reached, the case in dispute shall then be submitted for arbitration to the Foreign Economic and Trade Arbitration Commission of the China Council for the Promotion of International Trade in accordance with the Provisional Rules of Procedure of the Foreign Economic and Trade Arbitration Commission of the China Council for the Promotion of International Trade. The Award made by the Commission shall be accepted as final and binding upon both parties. The fees for arbitration shall be borne by the losing party unless otherwise awarded by the Commission.

  (17)附加条款:以上任何条款如与以下附加条款有抵触时,以以下附加条款为准。

  Additional Clause :If any of the above-mentioned Clauses is inconsistent with the following Additional Clause(s), the latter to be taken as authentic.

  买 方 卖 方

  The Buyers:The Sellers:

英文合同 篇7

  销 售 合 同

  SALES CONTRACT

  编号:Contract No:日期: Date:

  签约地点:Signed at:

  卖方:Sellers:

  地址:Address:

  邮政编码:Postal Code:

  电话:Tel: 传真:Fax:

  买方:Buyers:

  地址:Address:

  邮政编码:Postal Code:

  电话:Tel: 传真:Fax:

  兹确认售予买方下列货品,其成交条款如下:

  The Seller hereby confirms selling the following goods on terms and conditions

  (3)公差:数量及总值均有_____%的增减,由卖方决定

  Tolerance: With _____% more or less both in amount and quantity allowed at the

  sellers option.

  (4) 原产地

  Country of Origin:

  (5) 付款方式:30%预付,70%发货前一周付清

  Payment terms: 30% deposit, 70% payment within one week before delivery.

  (6) 交货时间:收到预付款后15天内完成装运。

  Time of shipment: Within15 days after deposit received.

  (7) 贸易方式:FOBShanghai

  Terms of Shipment: FOBShanghai

  (8) 包装:胶合板木盘外封铁皮

  Packing: Plywood drum with steel sheet cover.

  (9) 保险:由卖方按发票全额110%投保至_____为止的_____险。

  Insurance: To be effected by seller for 110% of full invoice value covering _____ up to _____ only.

  (10) 装运口岸:中国上海港

  Port of Loading: Shanghai Port, China

  (11) 转运:允许

  Transshipment: Allowed

  (12) 分批装运:允许分批装运

  Partial Shipment: Allowed

  (13) 目的口岸:

  Port of Destination:

  (14) 唛头:Shipping Marks:

  (15) 单据:Documents:

  (16) 品质与数量、重量的异义与索赔:Quality/Quantity Discrepancy and Claim:

  (17) 逾期发运:如果由于买方原因造成逾期发运,买方承担责任。造成自签订合同之日起超过45天不能发运的,卖方将每日按货物金额的3%收取保管费;如果由于买方原因造成逾期发运超过6个月,卖方有权自行处置定金和货物。如果是卖方原因造成的逾期发运,卖方需提前告知买方并得到买方的确认并承担其他相关费用。

  LAST SHIPMENT: if the late delivery is caused by the buyer, the buyer shall bear the

  responsibility. If the delay has being made more than 45 days from the signing of the Sales Contract hereof, the buyer shall pay 3% of total amount each day, and if the delay is more than 6 months, the Seller has the right to dispose the down payment and the goods. If the late delivery is caused by the Seller, the Seller shall inform the Buyer in advance and get confirmation from the Buyer, and the related expense shall be born by the Seller.

  (18) 质量/数量异议:对于质量方面的异议,买方必须在货物抵达目的港后30天之类提出:对于数量方面的异议,买方必须在货物抵达目的港后15天之内提出。对由于保险公司、运输公司、其他运输机构或邮局的原因所造成的货物差异,卖方不负任何责任。 QUALITY/QUANTITY DISCREPANCY: In case of quality discrepancy, claim shall be filed by the Buyer within 30 days after the arrival of the goods at port of destination; while for quantity discrepancy, claim shall be filed by the buyer within 15 days after the arrival of the goods at port of destination. It is understood that the Seller shall not be liable, for any discrepancy of goods shipped due to causes for which the Insurance Company, Shipping Company, other transportation organization or Post Office are liable.

  (19) 不可抗力:卖方对由于下列原因而导致不能或暂时不能履行全部或部分合同义务的,不负责任:水灾、火灾、地震、干旱、战争或其他任何在签约时卖方不能预料、无法控制且不能避免和克服的事件。但卖方因尽快地将所发生的事件通知对方,并应在事件发生后15天内将有关机构出具的不可抗力事件的'证明寄交对方。如果不可抗力事件之影响超过120天,双方应协商合同继续履行或终止履行的事宜。

  FORCE MAJEURE: Seller shall not be responsible for failure or delay in performance of entire or portion of these Sale Contract obligations in consequence of Force Majeure incidents: flood, fire, earthquake, drought, war, or any other matters couldn’t be foreseen or controlled or couldn’t be avoided. But Seller shall inform the incidents to Buyer immediately, and shall delivery the certificate of Force Majeure incidents issued by related organization within 15 days after the incidents happened. If the incidents influence more than 120 days, both parties shall negotiate to decide whether to execute or terminate the Sales Contract.

  (20) 仲裁:因履行本合同所发生的一切争议,双方应友好协商解决,如协商仍不能解决争议,则应将争议提交中国国际经济贸易仲裁委员会(北京),依据其仲裁规则仲裁。仲裁裁决是终局的,对双方都有约束力。仲裁费应由败诉一方承担,但仲裁委员会另有裁定的除外。在仲裁期间,除仲裁部分之外的其他合同条款应继续执行。

  ARBITRATION: All disputes across from the execution of, or in connection with this Sales Contract shall be settled friendly through negotiation, in case no settlement can be reached, the case shall then be submitted to China International Economic and

  Trade Arbitration Commission, Beijing for arbitration in accordance with its provisional rules of procedure. The result of arbitration shall be born by the losing party except for the condition the Commission has other judgment. During the arbitration period, clauses beside of the arbitrated parts shall be executed.

  (21) 本合同为中英文对应,一式两份,买卖双方各执一份;合同自卖方签字盖章、买方签字后生效(传真件以及扫描具有正版相等法律效应)。

  The Sales Contract is concluded in Chinese and English with same effectiveness, and will come into effect on stamp of Seller and signing by Buyer. The Sales Contract is in dual original and each party shall have one original copy of this Sales Contract. (Any scanned and faxed copy shall have the same legal effect as the original one.)

  (22) 备注:Remark:

  买方确认签署: 卖方确认签署:

  For and on behalf of Buyer:For and on behalf of Seller:

英文合同 篇8

  合作协议书

  Cooperation Agreement

  合同编号:

  Contract No.:签订地点:西安

  Signing place of contract: Xi’an

  甲、乙双方本着互利互惠,诚实守信,优势互补的原则,经过友好协商,就甲方对于乙方生产太阳能电池组件中介合作事宜,达成如下协议:

  Party A and Party B agree to sign the cooperation contract on producing of solar panels, and that Party A introduces buyers for Party B, for mutual benefits in conditions as follows:

  1.合作内容

  Cooperative Content

  根据甲乙双方协商,达成以下合作内容:

  To conclude the below contents of cooperation according to negotiations between two parties:

  (1) 甲方介绍、协助和促成乙方与 签订生产 买卖合同;价格为,总价格为。

  Party A authorizes Party B to produce for .The unit price

  is, in sum .

  (2) 甲方应认真与其推荐的客户进行联络,介绍并推广乙方的产品,并为乙方与客户的沟通、谈判、商务运作等相关商务活动提供商业咨询服务,最终促成乙方与采购商签订买卖合同;

  On behalf of Party B, Party A is responsible to contact with, introduce Party B's products to and operate related business activities with, promote signing contract between party B and.

  (3) 如果在采购合同执行过程中,由于甲方客户方面的不当,发生问题,在乙方的要求下,甲方有义务进行协调解决执行合同的问题;并要求甲方

  客户按采购合同及本合同条款执行。由于乙方的原因没有执行好合同条款的情况下,那么甲方有权要求乙方按采购合同及本合同条款执行。

  In the process of execution purchase contract, when has

  undeserved problems, party A has duty to coordinate solving problems. When party B do not perform under the terms of contract well , Party A has right to require Party B executing terms of purchase contract.

  2.双方的责任、权利和义务

  Responsibilities, Rights and Obligations

  (1)甲方的责任、权利和义务

  Party A's responsibility, rights and obligations:

  A. 甲方负责与其推荐的客户进行联络、介绍并推广乙方的产品,并协助乙方对客户的沟通、谈判、商务运作等相关商务活动,最终能达成乙方与

  采购商签订买卖合同;

  On behalf of Party B, Party A is responsible to contact with , introduce Party B's products toand operate related business activities with ,promote signing contract between party B and .

  B. 如果在乙方签订的买卖合同执行过程中,由于甲方客户方面的原因而产生的问题,在乙方的要求下,甲方有义务进行协调解决执行合同的.问题;

  由于乙方的原因而产生的问题,在甲方客户的要求下,甲方有义务进行

  协调解决执行合同的问题;

  In the process of execution purchase contract, when has undeserved problems, party A has duty to coordinate solving problems. When party B do not perform under the terms of contract well, Party A has right to require Party B executing terms of purchase contract.

  C. 乙方与客户的买卖合同签订后,按照其合同约定履行。任何一方出现违约行为,甲方应予以积极协调解决,但甲方不承担对任何一方的任何担

  保责任或其他法律责任,甲方有明确承诺的除外。

  After signing purchase contract, no matter party B or broken, Party A will coordinate solving problems. Except commitment, Party

  A will not have warranty and other legal responsibility for any one side.

  (2)乙方的责任、权利和义务

  Party B's responsibilities, rights and obligations:

  乙方应保证生产太阳能电池组件的质量和功率数量,全部承担对于出现的产品质量和功率数量的责任;

  Party B should guarantee and be whole responsibility to quality and quantity of solar panels.

  3.费用与付款:

  Commission

  (1) 乙方提供甲方的咨询费,组件数量以乙方与签订的买卖合同为依据,以实际供货量为结算数量,共计。如果乙方供货量没有达到合

  同约定数量,乙方有权要求重新商定咨询费用;

  Party B pays Party A commission as , in sum, but the final commission amount will be subject to the actual quantity based on the sales contract. If the party B have not provided according to the sales contract, then the party B have right to re-negotiate the consulting fee.yiyi

  (2) 在乙方收到客户合同内规定的货柜的全款额后,通知甲方,甲方开具正规商业发票,乙方收到发票后15个工作日内支付相应货柜的咨询费。 Part B must inform Part A when receiving sum contract amount of specific container goods from the customer, and Part A should make out the standard commercial invoice. Part B must pay for the entire consulting fee of corresponding container after receiving the invoice within 15 working days.

  (3)若甲方未能促成 公司与乙方签署买卖合同,甲方无权要求乙方支付

  咨询费或者任何费用。咨询费用以实际发货量为准。

  If the Party A is unable to cause the signed contract between the Party

  B and company, the Party A is not entitled to claim any

  remuneration or fee.

  (4)甲方指定银行账户信息如下:

  Information of Party A designated bank account as below:

  4.违约责任

  Liability for Breach

  如果一方不能按照本协议执行而给另一方造成了损失,受害方有权利要求对方给予相应的赔偿。

  If any party is unable to perform this agreement and caused the loss of the other party, the victim has the right to ask for the corresponding compensation.

  5.转让和保密

  Assignment and confidentiality

  (1)未经过对方同意不得将本协议规定的责任、义务向第三方转让;

  Without the agreement of the other party, the responsibility and obligation of this cooperation agreement should not be transferred to third

  party.

  (2)合作项目的有关信息、各种资料文件和价格等,甲、乙双方应对第三方保密,不得以任何理由或方式泄密,因泄密造成的一切经济损失由泄密方负

英文合同 篇9

  出让方:戴黛 (以下简称“甲方”)

  The seller: DAY FREJA ANTIGONE FELICIA M D(hereinafter called Party A)

  受让方:(以下简称“乙方”)

  The buyer: (hereinafter called Party B)

  居间方:上海志远房地产经纪有限公司 (以下简称“丙方”)

  The Agent:SHANGHAI ZEAL REALTY CONSULTANT CO.,LTD. (hereinafter called Party C)

  在丙方的居间作用下,经友好协商,甲、乙双方达成如下一致:

  Under brokerage by Party C ,both Party A and Party B enter into the following agreement through friendly negotiation:

  1、甲方在此陈述其系 上海市南京西路1173弄5号31室(该房屋的所有权及其所占土地的所有权,以下合称“该房地产”)的合法产权人。甲方已取得的该房地产之《上海市房地产权证》号码为:静2005002083 _;该房地产之建筑面积为 125.3 平米。现甲方有意将该房地产转让给乙方,乙方亦愿意向甲方购买该房地产。 Party A confirms that she is the legal owner of the property which located at 31 , Block 5_ ,Lane 1173_, West of Nanjing RD, Jing’an _ District, Shanghai. Party A is in The property has an gross floor area of _125.3 _square metres. Now Party A intends to sell the property to Party B, and Party B is interested in buying the property.

  2、甲,乙双方约定该房地产实际成交价格为人民币 柒佰贰拾万元整(RMB 7,200,000.00 元_)。由乙方按本协议规定的支付方式支付甲方。

  The agreed price of the property is RMB 7,200,000.00 Party B shall pay the sum to Party A according to the terms of this agreement.

  3、乙方在此确认其于签订本协议前已对该房地产进行了初步验看。双方在此同意甲方将该房地产按现状交付乙方即可,但是甲方必须保证该房地产内的管道,线路畅通,包括该房地产设备的完好可正常使用。在该房地产交付前,上述设备如有故障,甲方应负责任修缮并支付相关费用。

  Party B confirmed that she has examined the property before signing this agreement. Both parties agree that Party A shall deliver it to Party B in current conditions . Party A shall ensure that the ducting and wiring of the property, and all the related fixtures and equipment are in good working order. If any is found to be defective, Party A shall make amend before delivery of property and bear the necessary costs.

  4、双方同意本次交易之具体交易程序如下:

  The procedure of the transaction for the property is as follows: possession of Shanghai Certificate of Real Estate Ownership, number: 2005002083

  A.双方同意本协议项下的定金数额为人民币 壹拾万元整(RMB 100,000.00 元_)。乙方应于签订本协议的当日支付(或补足至)定金计人民币壹拾万元整(RMB100,000.00元_)。 Both parties agree that the total amount of the deposit is RMB 100,000.00 ; Party B shall pay the deposit of the amount RMB 100,000.00_ on day of signing this agreement.

  甲方账号如下:

  Party A’S bank accout as below:

  开户行:

  Bank:

  户名:

  Name:

  账号:

  Account:

  B.甲,乙双方约定于 20xx 年 3 月 16 日前签订《上海市房地产买卖合同》(以下简称“该买卖合同”)并申

  请办理公证手续,乙方应于签订该买卖合同当日支付甲方首期房价款计人民币贰佰零陆万元整 (RMB_ 2,060,000.00 元_)。(包含定金)

  Both parties shall sign and notorise the Shanghai Real Estate Sale & Purchase Contract contract (hereafter called the Contract) before 16/3/20xx_. Party B shall pay the first Payment of the amount RMB 2,060,000.00_on the day of signing the Contract(inclusive of the deposit).

  甲方账号如下:

  Party A’S bank accout as below:

  开户行:

  Bank:

  户名:

  Name:

  账号:

  Account:

  C. 双方在此确认:本协议下乙方应支付给甲方的第二期房价款计 元_)可以由乙方通过向银行申请购房抵押贷款的形势支付,乙方应于支付首期房价款后的 40 _个工作日内,完成贷款审批手续,若银行贷款审批额度不足,乙方应于办理产权过户手续当日补足。 Party B may pay the second payment of the amount RMB_ 5,040,000.00 _in the way of mortgage Loan. Party B shall complete the mortgage application procedure within 40 _ working days after first payment. If the amount of mortgage approved by the bank is less than the second payment, Party

  B shall top up the difference when the title is transferred.

  D.甲方应于 / 年 / 月 / 日前完成提前还贷及抵押登记注销手续。

  Party A shall repay all outstanding mortgage and cancel the current mortgage registration before/

  E. 待完成上述款项所述事项后的 5_日内,甲乙双方应前往房地产交易中心申请办理交易之产权过户,抵押登记手续,并缴纳相关税费。

  Both Parties shall go to the Property Exchange Center to apply for the transfer of title and registration of mortgage within 5_ days after the aforesaid has been done ,and pay the prescribed tax and fees.

  F.待过户当日,甲方安排把所有住户搬离此物业并迁出所有户口(若有),然后与乙方办理交房手续,同时乙方支付甲方房价尾款计人民币壹拾万元整整_(RMB100,000.00)。

  Party A shall vacate all tenants and remove all the residence registration on the day of transfer

  of title, and then deliver the property to Party B. Party B shall pay the last payment with the amount RMB 100,000.00 to Party A.

  5、待双方签定本协议第4条第B款所述之《上海市房地产买卖合同》生效后,本协议自行终止,甲,乙双方应按买卖合同所列条款履行。

  When the Contract takes effect, this agreement is terminated immediately. Both parties shall observe the Contract.

  6、甲、乙双方同意,涉及本交易的各项税费由甲、乙双方按国家政策、法规的规定承担。甲、乙双方同意本协议第4条第B款所述之《上海市房地产买卖合同》公证出来后3个工作日内甲乙双方应前往该房屋所在房地产交易中心申请缴纳税费。

  Both parties agree that they shall bear the fees and taxes according to the laws. Both parties shall observe the Contract that they go to the Property Exchange Center and pay the fees and taxes within 3 workdays after the Contract be notarized .

  7、双方约定,本协议履行过程中,若因国家政策未获批准导致乙方无法购买该房地产的,双方同意解除本协议互不承担违约责任。甲方应在收到本协议终止后的_ 5 个工作日内退还乙方已支付的房款(含定金)。

  If it is due to government actions which cause Party B not be able to purchase the property, both Parties agree to terminate this agreement without any breach by any party. In such an event Party

  A shall return any amount paid by Party B within _5_ working days after the agreement is terminated.

  8、在本协议履行的.过程中,若因甲方原因导致本协议无法履行,甲方应双倍返还定金;若因乙方原因导致本协议无法履行,乙方已支付的定金由甲方没收。

  During the course of this agreement, if Party A breaches the agreement, Party A shall return the deposit in double; if Party B breaches the agreement, the deposit paid by Party B shall be forfeited.

  9、签订本协议后,甲、乙双方任何一方或双方未能履行本协议,导致双方的买卖合同无法签署的,违约方应向丙方支付违约金,违约金数额为本协议第2条所述房价款的2%。

  After signing this agreement, if either Party A or Party B or both paties fail to carry out this agreement, leading to the Shanghai Real Estate Sale & Purchase Contract not able to be signed, the party in breach of the agreement shall pay the penalty to Party C. The penalty is 2% of the actual price as contained in Article 2 of this agreement.

  10、本协议用中文和英文写成,两种文字具有同等效力。上述两种文字如有不符,以中文本为准。

  This agreement is written in Chinese and English, both versions should be equally valid. If there are differences between the two versions, the Chinese version shall prevail.

  11、本协议一经甲、乙双方或其各自合法授权代表签字立即生效,本协议一式三份,甲、乙双方各执壹份,中介方执壹份。

  This agreement is signed in three duplicates, all of which are of the same legal effect. Each party shall hold on to one duplicate .

  出卖方(甲方) 买受方(乙方)

  The Seller(Party A):The Buyer(Party B):

  护照号码/身份证号码:护照号码/身份证号码:

  Passport/ID No: Passport/ID No:

  国籍:国籍:

  Nationality: Nationality:

  居间方:上海志远房地产经纪有限公司 (以下简称“丙方”)

  The Agent:SHANGHAI ZEAL REALTY CONSULTANT CO.,LTD. (hereinafter called Party C) 地址:上海市长乐路1219号长鑫大厦12楼(200031)

  Address:12F, 1219 Chang Le Road, Changxin Tower, Shanghai (200031)

英文合同 篇10

  Purchase Contract

  合同编号(Contract No.): _______________

  签订日期(Date) :___________ 签订地点(Signed at) :___________

  买方:__________________________

  The Buyer:________________________

  地址: __________________________

  Address: _________________________

  电话(Tel):___________ 传真(Fax):__________

  电子邮箱(E-mail):______________________

  卖方:___________________________

  The Seller:_________________________

  地址:___________________________

  Address: __________________________

  电话(Tel):_________ 传真(Fax):___________

  电子邮箱(E-mail):______________________

  买卖双方同意按照下列条款签订本合同:

  The Seller and the Buyer agree to conclude this Contract subject to the terms and conditions stated below:

  1. 货物名称、规格和质量(Name, Specifications and Quality of Commodity):

  2. 数量(Quantity):

  允许____的溢短装(___% more or less allowed)

  3. 单价(Unit Price):

  4. 总值(Total Amount):

  5. 交货条件(Terms of Delivery) FOB/CFR/CIF_______

  6. 原产地国与制造商 (Country of Origin and Manufacturers):

  7. 包装及标准(Packing):

  货物应具有防潮、防锈蚀、防震并适合于远洋运输的包装,由于货物包装不良而造成的货物残损、灭失应由卖方负责。卖方应在每个包装箱上用不褪色的颜色标明尺码、包装箱号码、毛重、净重及“此端向上”、“防潮”、“小心轻放”等标记。

  The packing of the goods shall be preventive from dampness, rust, moisture, erosion and shock, and shall be suitable for ocean transportation/ multiple transportation. The Seller shall be liable for any damage and loss of the goods attributable to the inadequate or improper packing. The measurement, gross weight, net weight and the cautions such as "Do not stack up side down", "Keep away from moisture", "Handle with care" shall be stenciled on the surface of each package with fadeless pigment.

  8. 唛头(Shipping Marks):

  9. 装运期限(Time of Shipment):

  10. 装运口岸(Port of Loading):

  11. 目的口岸(Port of Destination):

  12. 保险(Insurance):

  由____按发票金额110%投保_____险和_____附加险。

  Insurance shall be covered by the ________ for 110% of the invoice value against _______ Risks and __________ Additional Risks.

  13. 付款条件(Terms of Payment):

  (1) 信用证方式:买方应在装运期前/合同生效后__日,开出以卖方为受益人的不可撤销的议付信用证,信用证在装船完毕后__日内到期。

  Letter of Credit: The Buyer shall, ______ days prior to the time of shipment /after this Contract comes into effect, open an irrevocable Letter of Credit in favor of the Seller. The Letter of Credit shall expire ____ days after the completion of loading of the shipment as stipulated.

  (2) 付款交单:货物发运后,卖方出具以买方为付款人的付款跟单汇票,按即期付款交单(D/P)方式,通过卖方银行及_____银行向买方转交单证,换取货物。

  Documents against payment: After shipment, the Seller shall draw a sight bill of exchange on the Buyer and deliver the documents through Sellers bank and ______ Bank to the Buyer against payment, i.e D/P. The Buyer shall effect the payment immediately upon the first presentation of the bill(s) of exchange.

  (3) 承兑交单:货物发运后,卖方出具以买方为付款人的付款跟单汇票,付款期限为____后__日,按即期承兑交单(D/A__日)方式,通过卖方银行及______银行,经买方承兑后,向买方转交单证,买方在汇票期限到期时支付货款。

  Documents against Acceptance: After shipment, the Seller shall draw a sight bill of exchange, payable_____ days after the Buyers delivers the document through Seller’s bank and _________Bank to the Buyer against acceptance (D/A ___ days). The Buyer shall make the payment on date of the bill of exchange.

  (4) 货到付款:买方在收到货物后__天内将全部货款支付卖方(不适用于FOB、CRF、CIF术语)。

  Cash on delivery (COD): The Buyer shall pay to the Seller total amount within ______ days after the receipt of the goods (This clause is not applied to the Terms of FOB, CFR, CIF).

  14. 单据(Documents Required):

  卖方应将下列单据提交银行议付/托收:

  The Seller shall present the following documents required to the bank for negotiation/collection:

  (1) 标明通知收货人/受货代理人的全套清洁的、已装船的、空白抬头、空白背书并注明运费已付/到付的海运/联运/陆运提单。

  Full set of clean on board Ocean/Combined Transportation/Land Bills of Lading and blank endorsed marked freight prepaid/ to collect;

  (2) 标有合同编号、信用证号(信用证支付条件下)及装运唛头的商业发票一式__份; Signed commercial invoice in ______copies indicating Contract No., L/C No. (Terms of L/C) and shipping marks;

  (3) 由______出具的装箱或重量单一式__份;

  Packing list/weight memo in ______ copies issued by__;

  (4) 由______出具的质量证明书一式__份;

  Certificate of Quality in _______ copies issued by____;

  (5) 由______出具的.数量证明书一式__份;

  Certificate of Quantity in ___ copies issued by____;

  (6) 保险单正本一式__份(CIF 交货条件);

  Insurance policy/certificate in ___ copies (Terms of CIF);

  (7)____签发的产地证一式__份;

  Certificate of Origin in ___ copies issued by____;

  (8) 装运通知(Shipping advice): 卖方应在交运后_____小时内以特快专递方式邮寄给买方上述第__项单据副本一式一套。

  The Seller shall, within ____ hours after shipment effected, send by courier each copy of the above-mentioned documents No. __.

  15. 装运条款(Terms of Shipment):

  (1) FOB交货方式

  卖方应在合同规定的装运日期前30天,以____方式通知买方合同号、品名、数量、金额、包装件、毛重、尺码及装运港可装日期,以便买方安排租船/订舱。装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。

  The Seller shall, 30 days before the shipment date specified in the Contract, advise the Buyer by _______ of the Contract No., commodity, quantity, amount, packages, gross weight, measurement, and the date of shipment in order that the Buyer can charter a vessel/book shipping space. In the event of the Seller's failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller's account.

  (2) CIF或CFR交货方式

  卖方须按时在装运期限内将货物由装运港装船至目的港。在CFR术语下,卖方应在装船前2天以____方式通知买方合同号、品名、发票价值及开船日期,以便买方安排保险。

  The Seller shall ship the goods duly within the shipping duration from the port of loading to the port of destination. Under CFR terms, the Seller shall advise the Buyer by _________ of the Contract No., commodity, invoice value and the date of dispatch two days before the shipment for the Buyer to arrange insurance in time.

  16. 装运通知(Shipping Advice):

  一俟装载完毕,卖方应在__小时内以____方式通知买方合同编号、品名、已发运数量、发票总金额、毛重、船名/车/机号及启程日期等。

  The Seller shall, immediately upon the completion of the loading of the goods, advise the Buyer of the Contract No., names of commodity, loading quantity, invoice values, gross weight, name of vessel and shipment date by _________ within ________hours.

  17. 质量保证(Quality Guarantee):

  货物品质规格必须符合本合同及质量保证书之规定,品质保证期为货到目的港__个月内。在保证期限内,因制造厂商在设计制造过程中的缺陷造成的货物损害应由卖方负责赔偿。 The Seller shall guarantee that the commodity must be in conformity with the quatity,

  specifications and quantity specified in this Contract and Letter of Quality Guarantee. The guarantee period shall be ______ months after the arrival of the goods at the port of destination, and during the period the Seller shall be responsible for the damage due to the defects in designing and manufacturing of the manufacturer.

  18. 检验(Inspection) (以下两项任选一项):

  (1)卖方须在装运前__日委托______检验机构对本合同之货物进行检验并出具检验证书,货到目的港后,由买方委托________检验机构进行检验。

  The Seller shall have the goods inspected by ______ days before the shipment and have the Inspection Certificate issued by____. The Buyer may have the goods reinspected by ________ after the goods?rrival at the destination.

  (2) 发货前,制造厂应对货物的质量、规格、性能和数量/重量作精密全面的检验,出具检验证明书,并说明检验的技术数据和结论。货到目的港后,买方将申请中国商品检验局(以下简称商检局)对货物的规格和数量/重量进行检验,如发现货物残损或规格、数量与合同规定不符,除保险公司或轮船公司的责任外,买方得在货物到达目的港后__日内凭商检局出具的检验证书向卖方索赔或拒收该货。在保证期内,如货物由于设计或制造上的缺陷而发生损坏或品质和性能与合同规定不符时,买方将委托中国商检局进行检验。

  The manufacturers shall, before delivery, make a precise and comprehensive inspection of the goods with regard to its quality, specifications, performance and quantity/weight, and issue inspection certificates certifying the technical data and conclusion of the inspection. After arrival of the goods at the port of destination, the Buyer shall apply to China Commodity Inspection Bureau (hereinafter referred to as CCIB) for a further inspection as to the specifications and quantity/weight of the goods. If damages of the goods are found, or the specifications and/or quantity are not in conformity with the stipulations in this Contract, except when the responsibilities lies with Insurance Company or Shipping Company, the Buyer shall, within _____ days after arrival of the goods at the port of destination, claim against the Seller, or reject the goods according to the inspection certificate issued by CCIB. In case of damage of the goods incurred due to the design or manufacture defects and/or in case the quality and performance are not in conformity with the Contract, the Buyer shall, during the guarantee period, request CCIB to make a survey.

  19. 索赔(Claim):

  买方凭其委托的检验机构出具的检验证明书向卖方提出索赔(包括换货),由此引起的全部费用应由卖方负担。若卖方收到上述索赔后______天未予答复,则认为卖方已接受买方索赔。

  The buyer shall make a claim against the Seller (including replacement of the goods) by the further inspection certificate and all the expenses incurred therefrom shall be borne by the Seller. The claims mentioned above shall be regarded as being accepted if the Seller fail to reply within ______days after the Seller received the Buyer's claim.

  20. 迟交货与罚款(Late delivery and Penalty):

  除合同第21条不可抗力原因外,如卖方不能按合同规定的时间交货,买方应同意在卖方支付罚款的条件下延期交货。罚款可由议付银行在议付货款时扣除,罚款率按每__天收__%,不足__天时以__天计算。但罚款不得超过迟交货物总价的____%。如卖方延期交货超过合同规定__天时,买方有权撤销合同,此时,卖方仍应不迟延地按上述规定向买方支付罚款。

  买方有权对因此遭受的其它损失向卖方提出索赔。

  Should the Seller fail to make delivery on time as stipulated in the Contract, with the exception of Force Majeure causes specified in Clause 21 of this Contract, the Buyer shall agree to postpone the delivery on the condition that the Seller agree to pay a penalty which shall be deducted by the paying bank from the payment under negotiation. The rate of penalty is charged at______% for every ______ days, odd days less than _____days should be counted as ______ days. But the penalty, however, shall not exceed_______% of the total value of the goods involved in the delayed delivery. In case the Seller fail to make delivery ______ days later than the time of shipment stipulated in the Contract, the Buyer shall have the right to cancel the Contract and the Seller, in spite of the cancellation, shall nevertheless pay the aforesaid penalty to the Buyer without delay.

  The buyer shall have the right to lodge a claim against the Seller for the losses sustained if any.

  21. 不可抗力(Force Majeure):

  凡在制造或装船运输过程中,因不可抗力致使卖方不能或推迟交货时,卖方不负责任。在发生上述情况时,卖方应立即通知买方,并在__天内,给买方特快专递一份由当地民间商会签发的事故证明书。在此情况下,卖方仍有责任采取一切必要措施加快交货。如事故延续__天以上,买方有权撤销合同。

  The Seller shall not be responsible for the delay of shipment or non-delivery of the goods due to Force Majeure, which might occur during the process of manufacturing or in the course of loading or transit. The Seller shall advise the Buyer immediately of the occurrence mentioned above and within_____ days thereafter the Seller shall send a notice by courier to the Buyer for their acceptance of a certificate of the accident issued by the local chamber of commerce under whose jurisdiction the accident occurs as evidence thereof. Under such circumstances the Seller, however, are still under the obligation to take all necessary measures to hasten the delivery of the goods. In case the accident lasts for more than _____ days the Buyer shall have the right to cancel the Contract.

  22. 争议的解决 (Arbitration):

  凡因本合同引起的或与本合同有关的任何争议应协商解决。若协商不成,应提交中国国际经济贸易仲裁委员会深圳分会,按照申请仲裁时该会现行有效的仲裁规则进行仲裁。仲裁裁决是终局的,对双方均有约束力。

  Any dispute arising from or in connection with the Contract shall be settled through friendly negotiation. In case no settlement is reached, the dispute shall be submitted to China International Economic and Trade Arbitration Commission (CIETAC),Shenzhen Commission for arbitration in accordance with its rules in effect at the time of applying for arbitration. The arbitral award is final and binding upon both parties.

  23. 通知(Notices):

  所有通知用____文写成,并按照如下地址用传真/电子邮件/快件送达给各方。如果地址有变更,一方应在变更后__日内书面通知另一方。

  All notice shall be written in _____ and served to both parties by fax/courier according to the following addresses. If any changes of the addresses occur, one party shall inform the other party of the change of address within ____days after the change.

  24. 本合同使用的FOB、CFR、CIF术语系根据国际商会《20xx年国际贸易 术语解释通则》。

  The terms FOB、CFR、CIF in the Contract are based on INCOTERMS 20xx of the

【英文合同】相关文章:

英文翻译合同03-02

【精品】英文合同四篇05-03

英文合同汇编9篇04-27

有关英文合同四篇04-27

实用的英文合同四篇04-27

实用的英文合同4篇04-28

英文合同合集8篇04-28

关于英文合同5篇04-27

【必备】英文合同三篇04-28

英文合同集合五篇04-29